Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Dec 2025 |
| Application filed | 18 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Gargantuan Industrial Space Solutions Private Limited |
| Use | Other |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹7.3 crore |
| Village / locality | Rabada |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06115 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Jul 2025 | Lapsed | 3.3 acres | ₹7.3 crore |
| Expansion filed 18 Sept 2024 (this page) | Environmental approval granted | 3.3 acres | ₹7.3 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is smaller than 57% of them.
195 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rabada, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in Data centre project by M/s. GARGANTUAN INDUSTRIAL SPACE… — lapsed, 0 m away
- Expansion in for "Data Center" at Plot No. R-847/2 & R-979, R-847/3,… — environmental approval granted, 250 m away
- Expansion for "Data Center" at Plot No. R-847/2 & R-979, R-847/3, R-847/3/1,… — environmental approval granted, 250 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — environmental approval granted, 250 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — withdrawn, 250 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — environmental approval granted, 250 m away
- Application for EC for proposed Data Center (IT) buildings (MUM-3) on Plot No.… — environmental approval granted, 550 m away
- Proposed expansion project for manufacturing of Synthetic Organic Chemicals… — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.