Quick answers
What is this project?
500 KLPD Grain-Based Distillery Unit for Production of 500 KLPD Fuel Ethanol or 400 KLPD Ethanol and 100 KLPD RS/ENA is a withdrawn industrial project in Deori, Gondiya, Maharashtra. The site covers 19.8 acres.
Who is building it?
The applicant is Sufalam Foods and Beverages Private Limited.
Has it been approved?
No. The application was withdrawn on 6 Oct 2026, so it is no longer under consideration.
Where is it?
In Deori, Gondiya, Maharashtra.
How big is it?
It has a stated cost of ₹423 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 6 Oct 2026.
Project details
| Official title | Proposed Establishment of a 500 KLPD Grain-Based Distillery Unit for Production of 500 KLPD Fuel Ethanol or 400 KLPD Ethanol and 100 KLPD RS/ENA, along with an 8.5 MW Captive Power Plant |
|---|---|
| Status | Withdrawn |
| Status since | 6 Oct 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sufalam Foods and Beverages Private Limited |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹423 crore |
| Village / locality | Deori |
| Taluk / tehsil | Deori |
| District | Gondiya |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13308 |
In context
9 applications in Gondiya since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deori, Gondiya, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Proposed setup of new grain based 210 KLPD Ethanol Distillery… — withdrawn, 200 m away
- Proposed expansion of existing grain based distillery capacity from 300 KLPD… — environmental approval granted, 200 m away
- Proposed expansion of existing grain based distillery capacity from 300 KLPD… — returned to applicant, 200 m away
- Proposed expansion of existing grain based distillery capacity from 300 KLPD… — cleared for impact study, 200 m away
- Increase in production capacity — initial checks, 200 m away
- Diversion of 10.2297 ha for Construction of 132 KV Transmission Line LILO on… — more information requested, 12.1 km away
- Diversion of 10.2297 ha for Construction of 132 KV Transmission Line LILO on… — under forest review, 12.1 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.11 ha) at… — lapsed, 16.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.