Quick answers
What is this project?
Proposed expansion of existing grain based distillery capacity from 300 KLPD to 500 KLPD at Plot No. D-3, MIDC Deori, Taluka-Deori, District–Gondia, Maharashtra State by M/s. Sufalam Industries Limited is a proposed industrial project in Deori, Gondiya, Maharashtra. The site covers 24.7 acres.
Who is building it?
The applicant is Sufalam Industries Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Deori, Gondiya, Maharashtra.
How big is it?
It has a stated cost of ₹277.4 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 1 May 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing grain based distillery capacity from 300 KLPD to 500 KLPD…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 22 May 2026 |
| Application filed | 1 May 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Sufalam Industries Limited |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹277.4 crore |
| Village / locality | Deori |
| Taluk / tehsil | Deori |
| District | Gondiya |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14093 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 May 2026 | Environmental approval granted | 24.7 acres | ₹277.4 crore |
| Expansion filed 1 May 2026 (this page) | Returned to applicant | 24.7 acres | ₹277.4 crore |
| Early planning filed 5 Dec 2025 | Cleared for impact study | 24.7 acres | ₹277.4 crore |
In context
9 applications in Gondiya since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deori, Gondiya, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Proposed setup of new grain based 210 KLPD Ethanol Distillery… — withdrawn, 0 m away
- Proposed expansion of existing grain based distillery capacity from 300 KLPD… — environmental approval granted, 0 m away
- Proposed expansion of existing grain based distillery capacity from 300 KLPD… — cleared for impact study, 0 m away
- Increase in production capacity — initial checks, 0 m away
- 500 KLPD Grain-Based Distillery Unit for Production of 500 KLPD Fuel Ethanol… — withdrawn, 200 m away
- Diversion of 10.2297 ha for Construction of 132 KV Transmission Line LILO on… — more information requested, 12.1 km away
- Diversion of 10.2297 ha for Construction of 132 KV Transmission Line LILO on… — under forest review, 12.1 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.11 ha) at… — lapsed, 16.9 km away
More from Sufalam Industries Limited in Gondiya
- Amendment in Proposed setup of new grain based 210 KLPD Ethanol Distillery… — withdrawn
- Increase in production capacity — initial checks
All 5 Sufalam Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.