Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jul 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Taiyo Kagaku India Private Limited |
| Use | Industrial |
| Land area | 20.1 acres (8.1 ha) |
| Built-up area | 33,091 m² (3,56,188 sq ft) |
| Project cost | ₹176.7 crore |
| Village / locality | Jogeshwari |
| Taluk / tehsil | Gangapur |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13362 |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.1 acres, this one is larger than 56% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jogeshwari, Gangapur, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Speciality Polymers Manufacturing Unit (Manufacture of Polyethylene… — cleared for impact study, 2.6 km away
- Proposed manufacturing and synthesis of packaging adhesives under Product Mix… — initial checks, 2.7 km away
- Proposed Speciality Polymers Manufacturing Unit (Manufacture of Polyethylene… — returned to applicant, 2.7 km away
- Proposed Speciality Polymers Manufacturing Unit (Manufacture of Polyethylene… — returned to applicant, 2.7 km away
- Proposed Speciality Polymers Manufacturing Unit (Manufacture of Polyethylene… — cleared for impact study, 2.7 km away
- Expansion in Proposed Industrial Shed Construction Project at Plot No-A1 Waluj… — environmental approval granted, 3 km away
- Expansion in Proposed Industrial Shed Construction Project at Plot No-A1 Waluj… — cleared for impact study, 3 km away
- Project by Curia India Private Limited — initial checks, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.