What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Aurangabad, Maharashtra

Expansion in Proposed Industrial Shed Construction Project at Plot No-A1 Waluj MIDC, gut no 365, 366, 367, 368 Waluj, Gut no 25 & 26 Naigaon Chh. Sambhajinagar, (Aurangabad) Maharashtra – 431136 by M/s. Bajaj Auto Limited.

Expansion in Proposed Industrial Shed Construction Project at Plot No-A1 Waluj MIDC, gut no 365, 366, 367, 368 Waluj, Gut no 25 & 26 Naigaon Chh. Sambhajinagar, (Aurangabad) Maharashtra – 431136 by M/s. Bajaj Auto Limited is an approved industrial building project in Jogeshwari, Gangapur, Aurangabad, Maharashtra. The site covers 896.1 acres. Its stated project cost is ₹230 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Jul 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since17 Jul 2026
Application filed23 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBajaj Auto Limited
UseIndustrial
Land area896.1 acres (362.6 ha)
Built-up area6,77,751 m² (72,95,244 sq ft)
Plot area36,26,400 m² (3,90,34,207 sq ft)
Project cost₹230 crore
Village / localityJogeshwari
Taluk / tehsilGangapur
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14298

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 May 2026 (this page)Environmental approval granted896.1 acres₹230 crore
Early planning filed 1 Jan 2026Cleared for impact study896.1 acres₹230 crore

In context

91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 896.1 acres, this one is larger than 98% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jogeshwari, Gangapur, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Bajaj Auto projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.