Quick answers
What is this project?
Proposed Integrated Township project at Village: Dhokawade, Alibag, Maharashtra by M/s. LODHA DEVELOPERS LIMITED is a proposed township project in Dhokawade, Alibag, Raigarh, Maharashtra. The site covers 112.3 acres.
Who is building it?
The applicant is Lodha Developers Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dhokawade, Alibag, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1,446.6 crore and a site of 112.3 acres.
When was it filed?
The application was filed on 8 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Lodha Developers Limited |
| Use | Township |
| Land area | 112.3 acres (45.5 ha) |
| Built-up area | 9,26,178 m² (99,69,287 sq ft) |
| Project cost | ₹1,446.6 crore |
| Village / locality | Dhokawade |
| Taluk / tehsil | Alibag |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13402 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 112.3 acres, this one is larger than 93% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhokawade, Alibag, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted, 50 m away
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted, 50 m away
- Proposed Integrated Township project at Village: Dhokawade, Tal.: Alibag,… — application filed, 50 m away
- Environment Clearance of Proposed Construction of Integrated Township Project — cleared for impact study, 100 m away
- Environment Clearance of Proposed Construction of Integrated Township Project — lapsed, 100 m away
- Environment Clearance of Proposed Construction of Integrated Township Project — environmental approval granted, 100 m away
- Proposed Integrated Township at Village Dhokawade, Taluka- Alibaug, Raigad,… — returned to applicant, 100 m away
- Proposed Holiday Home cum Resort at Survey No. 240 & 250, Village– Dhokawade,… — recommended by coastal authority, 550 m away
More from Lodha Developers Limited in Raigarh
- Expansion of Integrated Township Development Project at village Asode,… — environmental approval granted
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted
- Proposed Integrated Township project at Village: Dhokawade, Tal.: Alibag,… — application filed
5 Lodha (Macrotech Developers) projects in Raigarh
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.