Quick answers
What is this project?
Expansion of Integrated Township Development Project at village Asode, Wakalan, Bale, Bamali, Narivali, Narhen, Usatane, Nighu and Burdul, Taluka Ambernath District Thane is an approved township project in Turbhe, Panvel, Raigarh, Maharashtra. The site covers 1,459.8 acres.
Who is building it?
The applicant is Lodha Developers Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Feb 2026), as of 27 Nov 2026.
Where is it?
In Turbhe, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹14,661 crore and a site of 1,459.8 acres.
When was it filed?
The application was filed on 5 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Feb 2026 |
| Application filed | 5 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Buildings & townships |
| Applicant | Lodha Developers Limited |
| Use | Township |
| Land area | 1,459.8 acres (590.8 ha) |
| Project cost | ₹14,661 crore |
| Village / locality | Turbhe |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13943 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,459.8 acres, this one is larger than 99% of them.
65 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Turbhe, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Implementation of Water Supply and sewerage Scheme in Various Villages in… — lapsed, 2.9 km away
- Diversion of 3.32 Ha. forest land for Proposed development of 30 M wide… — lapsed, 3.1 km away
- Transfer of Environmental Clearance for Existing "Integrated Common Hazardous… — environmental approval granted, 3.4 km away
- Expansion of Existing 'Integrated Common Hazardous Waste Treatment, Storage… — environmental approval granted, 3.4 km away
- Proposed Residential & Commercial Project at Survey No -153/2/2, Mouje… — environmental approval granted, 3.6 km away
- Proposed Residential project at Gut No. 19/7 of village Dharna Camp, Rohinjan,… — lapsed, 3.7 km away
- Application for EC for Residential project at Survey No. 19/2 (pt), 19/3,… — environmental approval granted, 3.7 km away
- Proposed Residential development with shops on plot bearing Survey no. 135/1,… — withdrawn, 3.8 km away
More from Lodha Developers Limited in Raigarh
- Proposed Integrated Township project at Village: Dhokawade, Alibag,… — under environmental review
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted
- Proposed Integrated Township project at Village: Dhokawade, Tal.: Alibag,… — application filed
5 Lodha (Macrotech Developers) projects in Raigarh
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.