Quick answers
What is this project?
Expansion and Modernization of Existing Integrated Steel Plant by Enhancing the Capacity of Blast Furnace, Sinter Plant, Coke Oven Plant, Captive Power Plant and Addition of Blast Furnace (2300 Cum), Sinter Plant (220 Sqm), Coke Oven Plant (0.2 MTPA), Ground Granulated Blast Furnace Slag Plant (2.0 MTPA) and Oxygen Plant (Air Separation Unit 1500 TPD) by M/s Evonith Metallics Limited is a proposed industrial project in Barbadi, Wardha, Maharashtra. The site covers 294.1 acres.
Who is building it?
The applicant is Evonith Metallics Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Barbadi, Wardha, Maharashtra.
How big is it?
It has a stated cost of ₹12,367.5 crore and a site of 294.1 acres.
When was it filed?
The application was filed on 18 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Evonith Metallics Limited |
| Land area | 294.1 acres (119 ha) |
| Project cost | ₹12,367.5 crore |
| Village / locality | Barbadi |
| Taluk / tehsil | Wardha |
| District | Wardha |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13604 |
In context
15 applications in Wardha since January 2022 are in the same category (Industry): 4 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 294.1 acres, this one is larger than 53% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barbadi, Wardha, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 3.5 MTPA Integrated Steel Plant by Installing Basic Oxygen Furnace… — under environmental review, 650 m away
- Indrajit Power Private Limited , 80 MW Thermal Power Plant — lapsed, 800 m away
- Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6… — under environmental review, 1.6 km away
- Expansion of Steel plant (from 1.0 MTPA to 2.0 MTPA) at Bhugaon Link Road,… — lapsed, 1.6 km away
- Industrial project by Evonith Value Steels Limited — withdrawn, 1.6 km away
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted, 1.7 km away
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted, 1.7 km away
- Expansion and modification of existing 1.0 MTPA Steel Plant by adding 0.3 MTPA… — initial checks, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.