Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6 MTPA, Galvanised Coils & Sheets / Galvalume (Bare / Zam) from 0.6 MTPA to 1.6 MTPA, Colour Coated Coils from 0.3 MTPA to 0.8 MTPA, Power Plant from 80 MW to 130 MW with Addition of 2.5 MTPA Pellet Plant and Fabrication of 0.1 MTPA Engineering Products by M/s Evonith Value Steel Limited

Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6 MTPA, Galvanised Coils & Sheets / Galvalume (Bare / Zam) from 0.6 MTPA to 1.6 MTPA, Colour Coated Coils from 0.3 MTPA to 0.8 MTPA, Power Plant from 80 MW to 130 MW with Addition of 2.5 MTPA Pellet Plant and Fabrication of 0.1 MTPA Engineering Products by M/s Evonith Value Steel Limited is a proposed industrial project in Barbadi, Wardha, Maharashtra. The site covers 568.6 acres. Its stated project cost is ₹8,456.7 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Nov 2026).

See it on the live map All projects in Wardha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6 MTPA, Galvanised Coils & Sheets / Galvalume (Bare / Zam) from 0.6 MTPA to 1.6 MTPA, Colour Coated Coils from 0.3 MTPA to 0.8 MTPA, Power Plant from 80 MW to 130 MW with Addition of 2.5 MTPA Pellet Plant and Fabrication of 0.1 MTPA Engineering Products by M/s Evonith Value Steel Limited is a proposed industrial project in Barbadi, Wardha, Maharashtra. The site covers 568.6 acres.

Who is building it?

The applicant is Evonith Value Steel Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Barbadi, Wardha, Maharashtra.

How big is it?

It has a stated cost of ₹8,456.7 crore and a site of 568.6 acres.

When was it filed?

The application was filed on 18 Nov 2026.

Project details

StatusUnder environmental review
Status since19 Nov 2026
Application filed18 Nov 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantEvonith Value Steel Limited
Land area568.6 acres (230.1 ha)
Project cost₹8,456.7 crore
Village / localityBarbadi
Taluk / tehsilWardha
DistrictWardha
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-18162

In context

15 applications in Wardha since January 2022 are in the same category (Industry): 4 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 568.6 acres, this one is larger than 93% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barbadi, Wardha, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Evonith Value Steel Limited in Wardha

All 8 Evonith Value Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.