Quick answers
What is this project?
Diversion of Forest Land for Laying of Underground Ofc Duct and Cable to M/S Telesonic Network LTD Toprovide High Speed Internet Connectivity on Vr-189 Within the Row of Existing Road Passing Through Daund-Rakekuri-Ahmednagar Road Wildlife Forest Area is a lapsed telecom project in Kokangaon, Shrigonda, Ahmadnagar, Maharashtra. The site covers 0.6 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2025, so it is no longer under consideration.
Where is it?
In Kokangaon, Shrigonda, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.6 acres and 2,400 m² of forest land.
When was it filed?
The application was filed on 21 Jun 2024.
Project details
| Official title | Proposal for Diversion of Forest Land for Laying of Underground Ofc Duct and Cable to M/S Telesonic Network LTD Toprovide High Speed Internet Connectivity on Vr-189 Within the Row of Existing Road Passing Through Daund-Rakekuri-Ahmednagar Road Wildlife Forest Area at Kokangaon Village Tal- Shrigonda Dist- Ahmednagar |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2025 |
| Application filed | 21 Jun 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2,400 m² |
| Forest land | 2,400 m² |
| Project cost | ₹2 lakh |
| Village / locality | Kokangaon |
| Taluk / tehsil | Shrigonda |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14422 |
In context
23 applications in Ahmadnagar since January 2022 are in the same category (Telecom): 2 approved, 5 filed or under review, and 16 withdrawn, lapsed or rejected. At 0.6 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kokangaon, Shrigonda, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.048 Ha. Forest Land for Laying of Underground Ofc Duct & Cable… — under wildlife review, 0 m away
- Diversion of Forest Land for Laying of Underground Ofc Duct and Cable to M/S… — more information requested, 0 m away
- Rural Water Supply Scheme under Jal Jeevan Mission Village Kopardi, Taluka… — more information requested, 3.9 km away
- Rural Water Supply Scheme, under Jal Jeevan Mission Village Kopardi, Taluka… — lapsed, 4.1 km away
- Transfer of Environmental Clearance of 7500 TCD sugar unit, 40 MW Cogeneration… — under environmental review, 6.5 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — withdrawn, 6.5 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — environmental approval granted, 6.5 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — under environmental review, 6.5 km away
More from Bharti Airtel Limited in Ahmadnagar
- Diversion Of Forest Land Laying Underground OFC along the Existing Right Of… — in-principle approval, conditions pending
- Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam,… — lapsed
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — under forest review
- Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam,… — more information requested
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved
9 Bharti Airtel (Airtel) projects in Ahmadnagar
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.