Project details
| Official title | Proposed Construction of Railway Over Bridge in lieu of LC 55 at Km 143/00 on Western Railway Line on Vangaon Aashagad Ambesari Road S.H. 75 at Km. 8/200 at Vangaon |
|---|---|
| Status | More information requested |
| Status since | 21 Aug 2026 |
| Application filed | 1 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Public Works Department |
| Land area | 2.5 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹57 crore |
| Village / locality | Vangaon |
| Taluk / tehsil | Dahanu |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14451 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Jul 2023 (this page) | More information requested | 2.5 acres | ₹57 crore |
| New project filed 18 Nov 2022 | Lapsed | 2.5 acres | ₹57 crore |
In context
13 applications in Palghar since January 2022 are in the same category (Railways & metro): 3 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.5 acres, this one is smaller than 83% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vangaon, Dahanu, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Railway Over Bridge in lieu of LC 55 at Km 143/00 on Western Railway Line on… — lapsed, 0 m away
- "New EMU Carshed cum POH Workshop" at Vangaon on Western Railway under MUTP-… — under forest review, 2.4 km away
- "New EMU Carshed cum POH Workshop" at Vangaon on Western Railway under MUTP-… — more information requested, 2.4 km away
- Widening and Strengthening of the existing road (ODR 35) from the village… — under forest review, 2.7 km away
- 8 lane Access controlled Highways For Connectivity to Proposed Vadhavan Port… — in-principle approval, conditions pending, 3.7 km away
- 8 Lane Access Controlled Highways For Connectivity to Proposed Vadhavan Port… — lapsed, 3.8 km away
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — environmental approval granted, 6.8 km away
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — under environmental review, 6.8 km away
More from Public Works Department in Palghar
- New Anti Sea Erosion Bund along the High Tide Line (HTL) — recommended by coastal authority
- Restoration of existing anti-sea erosion bund from Pachubandar to Lagebandar… — recommended by coastal authority
- Anti-sea erosion bund (Soft Solution Laying geo containers for shore… — recommended by coastal authority
- Anti-sea erosion bund along the High Tide Line (HTL) — lapsed
6 Public Works Department, Maharashtra projects in Palghar
All 155 Public Works Department, Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.