Quick answers
What is this project?
Laying Underground Optical Fiber Cable along the road in ROW of ODR-62, SH-363, VR-126, and SH-381 from Todsa to Chandanwelli Route is a lapsed telecom project in Doddi S, Etapalli, Gadchiroli, Maharashtra. It seeks 2.2 acres of forest land.
Who is building it?
The applicant is Arcsons Infratech Private Limited.
Has it been approved?
No. The application was lapsed on 22 Nov 2024, so it is no longer under consideration.
Where is it?
In Doddi S, Etapalli, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹38 lakh and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 14 Feb 2023.
Project details
| Official title | Laying Underground Optical Fiber Cable along the road in ROW of ODR-62, SH-363, VR-126, and SH-381 from Todsa to Chandanwelli Route in Etapalli Tehsil of Dist. Gadchiroli |
|---|---|
| Status | Lapsed |
| Status since | 22 Nov 2024 |
| Application filed | 14 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Arcsons Infratech Private Limited |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Doddi S |
| Taluk / tehsil | Etapalli |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14458 |
In context
40 applications in Gadchiroli since January 2022 are in the same category (Telecom): 0 approved, 27 filed or under review, and 13 withdrawn, lapsed or rejected.
Where it is
Doddi S, Etapalli, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Usof Mahuso076 — lapsed, 5.5 km away
- Laying Underground Optical Fibre Cable along the road in ROW of SH -276… — lapsed, 10.7 km away
- New Greenfield Highway from Navegoan More- Konsari (Steel Plant) to Hedri… — cleared for impact study, 10.8 km away
- Usof Mahuso070 — lapsed, 11.4 km away
- Slurry Pipe Line from Surjagarh Iron ore Mines to Konsari of Lloyds Metals &… — forest land use approved, 11.9 km away
- WILDLIFE CLEARANCE FROM STATE BOARD FOR WILDLIFE (SBWL) FOR LAYING OF… — more information requested, 12.8 km away
- New Greenfield Highway from Navegoan More- Konsari (Steel Plant) to Hedri… — cleared for impact study, 13.3 km away
- Proposed Industrial Township Project 'LLOYDS WAINGANGA RESORT' at Aldandi,… — under environmental review, 14.2 km away
All 7 Arcsons Infratech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.