WILDLIFE CLEARANCE FROM STATE BOARD FOR WILDLIFE (SBWL) FOR LAYING OF UNDERGROUND SLURRY PIPELINE OVER AN AREA OF 8.8226 Ha. (FOREST – 7.5201 HA AND NON FOREST- 1.3025 HA) ALONG THE ROAD WITHIN RoW OF EXISTING ROADS FROM HEDRI TO KONSARI UNDER ETAPALLI, CHAMORSHI AND MULCHERA TEHSIL OF DISTRICT GADCHIROLI IN THE STATE OF MAHARASHTRA

WILDLIFE CLEARANCE FROM STATE BOARD FOR WILDLIFE (SBWL) FOR LAYING OF UNDERGROUND SLURRY PIPELINE OVER AN AREA OF 8.8226 Ha. (FOREST – 7.5201 HA AND NON FOREST- 1.3025 HA) ALONG THE ROAD WITHIN RoW OF EXISTING ROADS FROM HEDRI TO KONSARI UNDER ETAPALLI, CHAMORSHI AND MULCHERA TEHSIL OF DISTRICT GADCHIROLI IN THE STATE OF MAHARASHTRA is a proposed road project in Alenga, Etapalli, Gadchiroli, Maharashtra. The site covers 21.8 acres. Its stated project cost is ₹400 crore. As of 27 Nov 2026, its status is “More information requested” (since 31 Dec 2023).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

WILDLIFE CLEARANCE FROM STATE BOARD FOR WILDLIFE (SBWL) FOR LAYING OF UNDERGROUND SLURRY PIPELINE OVER AN AREA OF 8.8226 Ha. (FOREST – 7.5201 HA AND NON FOREST- 1.3025 HA) ALONG THE ROAD WITHIN RoW OF EXISTING ROADS FROM HEDRI TO KONSARI UNDER ETAPALLI, CHAMORSHI AND MULCHERA TEHSIL OF DISTRICT GADCHIROLI IN THE STATE OF MAHARASHTRA is a proposed road project in Alenga, Etapalli, Gadchiroli, Maharashtra. The site covers 21.8 acres.

Who is building it?

The applicant is Lloyds Metals and Energy Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Alenga, Etapalli, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹400 crore and a site of 21.8 acres.

When was it filed?

The application was filed on 31 Dec 2023.

Project details

Official titlePROPOSAL FOR WILDLIFE CLEARANCE FROM STATE BOARD FOR WILDLIFE (SBWL) FOR LAYING OF UNDERGROUND SLURRY PIPELINE OVER AN AREA OF 8.8226 Ha. (FOREST – 7.5201 HA AND NON FOREST- 1.3025 HA) ALONG THE ROAD WITHIN RoW OF EXISTING ROADS FROM HEDRI TO KONSARI UNDER ETAPALLI, CHAMORSHI AND MULCHERA TEHSIL OF DISTRICT GADCHIROLI IN THE STATE OF MAHARASHTRA.
StatusMore information requested
Status since31 Dec 2023
Application filed31 Dec 2023
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantLloyds Metals and Energy Limited
Land area21.8 acres (8.8 ha)
Project cost₹400 crore
Village / localityAlenga
Taluk / tehsilEtapalli
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16390

In context

69 applications in Gadchiroli since January 2022 are in the same category (Roads & highways): 3 approved, 47 filed or under review, and 19 withdrawn, lapsed or rejected. At 21.8 acres, this one is smaller than 60% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Alenga, Etapalli, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lloyds Metals and Energy Limited in Gadchiroli

29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.