Project details
| Official title | BSNL OFC Laying and Land Acquisition activities for 4 G saturation project at village Harpud and Varoti Tal.Velhe,Dist Pune |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 29 Jan 2026 |
| Application filed | 10 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 438.1 acres (177.3 ha) |
| Forest land | 850 m² |
| Project cost | ₹6 lakh |
| Village / locality | Harpud |
| Taluk / tehsil | Velhe |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14514 |
In context
25 applications in Pune since January 2022 are in the same category (Telecom): 0 approved, 7 filed or under review, and 18 withdrawn, lapsed or rejected. At 438.1 acres, this one is larger than 79% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harpud, Velhe, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 4.007 Ha. area for Forest Clearance in under Forest Conservation… — lapsed, 3.8 km away
- Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages:… — under forest review, 5.2 km away
- Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages:… — cleared for impact study, 5.2 km away
- Diversion of 79.9793 ha forest land for Warasgaon-Warangi Pumped Storage… — not approved, 8.6 km away
- Diversion of Forest Land for widening and improvement of Bhutonde Pal Wajeghar… — initial checks, 13.1 km away
- Warasgaon Warangi PSP — cleared for impact study, 13.7 km away
- Warasgaon Warangi PSP — cleared for impact study, 13.7 km away
- Warasgaon Warangi Pumped Storage Project — lapsed, 13.7 km away
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.