Quick answers
What is this project?
Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project is a proposed water and irrigation project in Dhak, Karjat, Raigarh, Maharashtra. The site covers 931.6 acres.
Who is building it?
The applicant is Torrent Energy Storage Solutions Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Dhak, Karjat, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹13,017.3 crore; a site of 931.6 acres and 575.8 acres (233 ha) of forest land.
When was it filed?
The application was filed on 11 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project
Project details
| Status | Under forest review |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 11 Aug 2026 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Torrent Energy Storage Solutions Private Limited |
| Land area | 931.6 acres (377 ha) |
| Forest land | 575.8 acres (233 ha) |
| Project cost | ₹13,017.3 crore |
| Village / locality | Dhak |
| Taluk / tehsil | Karjat |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14815 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 11 Aug 2026 (this page) | Under forest review | 931.6 acres | ₹13,017.3 crore |
| New project filed 19 Jan 2025 | Forest land use approved | 931.6 acres | ₹13,017.3 crore |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 931.6 acres, this one is smaller than 57% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhak, Karjat, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project — forest land use approved, 0 m away
- Saidongar 1 - Karjat Pumped Storage Project — environmental approval granted, 1.2 km away
- Saidongar 1 - Karjat Pumped Storage Project — environmental approval granted, 1.2 km away
- Saidongar 1 - Karjat Pumped Storage Project — cleared for impact study, 1.2 km away
- Saidongar Pumped Storage Project — lapsed, 1.6 km away
- Saidongar Pumped Storage Project (3000 MW+1200 MW) — returned to applicant, 1.8 km away
- Saidongar-2 Pumped Storage Project (1200 MW) — cleared for impact study, 2.6 km away
- Saidongar 2 - Maval Pumped Storage Project — cleared for impact study, 2.7 km away
More from Torrent Energy Storage Solutions Private Limited in Raigarh
- PEN Off-Stream Closed Loop Pumped Storage Project — under environmental review
- Saidongar 1 - Karjat Pumped Storage Project — environmental approval granted
- Saidongar 1 - Karjat Pumped Storage Project — environmental approval granted
- Saidongar 1 - Karjat Pumped Storage Project — cleared for impact study
6 Torrent Energy Storage projects in Raigarh
All 7 Torrent Energy Storage projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.