Quick answers
What is this project?
Bharti Airtel Ltd. 5G OFC Project Tal Paoni-Umred-Nagpur route DFO CHANDRAPUR is a lapsed telecom project in Kanpa, Nagbhir, Chandrapur, Maharashtra. It seeks 0.2 acres of forest land.
Who is building it?
The applicant is Shahnawaz Ahmad.
Has it been approved?
No. The application was lapsed on 29 Jan 2024, so it is no longer under consideration.
Where is it?
In Kanpa, Nagbhir, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹8 lakh and 1,000 m² of forest land.
When was it filed?
The application was filed on 10 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Jan 2024 |
| Application filed | 10 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Shahnawaz Ahmad |
| Forest land | 1,000 m² |
| Project cost | ₹8 lakh |
| Village / locality | Kanpa |
| Taluk / tehsil | Nagbhir |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15010 |
In context
15 applications in Chandrapur since January 2022 are in the same category (Telecom): 0 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected.
Where it is
Kanpa, Nagbhir, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nagpur-Chandrapur Access Controlled Super Communication Expressway, Package-3… — under environmental review, 51.8 km away
- Proposed 0.9 MTPA Integrated Steel Plant (130 MW CPP, 0.9 MTPA DRI Plant… — under environmental review, 52.8 km away
- Proposed 0.9 MTPA Integrated Steel Plant (130 MW CPP, 0.9 MTPA DRI Plant… — not approved, 52.8 km away
- 2 x350 DRI Kilns for 2,31,000 TPA Production of Sponge Iron, Steel Melting… — environmental approval granted, 55.9 km away
- 2 x350 DRI Kilns for 2,31,000 TPA Production of Sponge Iron, Steel Melting… — cleared for impact study, 55.9 km away
- Environmental Clearance for proposed 1x250 MW Thermal Power Project by M/s.… — returned to applicant, 62.8 km away
- Bhandara-Gadchiroli Access Controlled Super Communication Expressway, Package-II — in-principle approval, conditions pending, 63.8 km away
- Diversion of 0.40 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 64.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.