Quick answers
What is this project?
Laying Underground Optical Fiber Cable Along The Road in Row of MDR-03 From Tikkameta To Kosmi Route is a lapsed telecom project in Protected Forest, Korchi, Gadchiroli, Maharashtra. The site covers 1.5 acres.
Who is building it?
The applicant is Reliance Jio Infocomm Limited.
Has it been approved?
No. The application was lapsed on 30 Sept 2024, so it is no longer under consideration.
Where is it?
In Protected Forest, Korchi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹28 lakh; a site of 1.5 acres and 3,400 m² of forest land.
When was it filed?
The application was filed on 16 Dec 2022.
Project details
| Official title | Laying Underground Optical Fiber Cable Along The Road in Row of MDR-03 From Tikkameta To Kosmi Route in Dhanora and Korchi Tehsil Of Dist. Gadchiroli in state of Maharashtra |
|---|---|
| Status | Lapsed |
| Status since | 30 Sept 2024 |
| Application filed | 16 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Limited |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 3,400 m² |
| Project cost | ₹28 lakh |
| Village / locality | Protected Forest |
| Taluk / tehsil | Korchi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15015 |
In context
40 applications in Gadchiroli since January 2022 are in the same category (Telecom): 0 approved, 27 filed or under review, and 13 withdrawn, lapsed or rejected. At 1.5 acres, this one is smaller than 81% of them.
Where it is
Protected Forest, Korchi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expressways, Economic and Inter Corridors under Bharatmala Pariyojana Phase-II… — lapsed, 11 km away
- Laying Underground Optical Fibre Cable Along The Road In Row Of Mdr-03 From… — more information requested, 18.8 km away
- Laying Underground Optical Fibre Cable Along The Road in Row of MDR-03 From… — lapsed, 18.8 km away
- Diversion of Forest Land 1.5558 Ha (Out of which 1.4938 Ha Forest land and… — more information requested, 19.2 km away
- Diversion of Forest Land 1.5558 Ha (Out of which 1.4044 Ha Forest land and… — more information requested, 19.2 km away
- Usof Mahuso401 — lapsed, 19.5 km away
- Diversion of 0.7589 Ha (out of which 0.6893 Ha Forest land and 0.1546 Ha… — more information requested, 20.4 km away
- Usof Mahuso062 — lapsed, 20.7 km away
More from Reliance Jio Infocomm Limited in Gadchiroli
- Re-Diversion of 2.658 Ha Land Under Van (Sanrakshan Evam Samvardhan)… — more information requested
- Laying Underground Optical Fibre Cable Along The Road in Row of SH-368, ODR-23… — lapsed
- Laying Underground Optical Fiber Cable in the ROW of SH-363 and MDR-02 from… — more information requested
- Laying Underground Optical Fiber Cable along the road in RoW of MDR-02 and… — more information requested
- Laying Underground Optical Fiber Cable along the road in ROW of MDR-02,… — lapsed
- Laying Underground Optical Fibre Cable along the road in ROW of… — lapsed
14 Reliance Jio Infocomm (Jio) projects in Gadchiroli
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.