Quick answers
What is this project?
Diversion of Forest Land 1.5558 Ha (Out of which 1.4938 Ha Forest land and 0.7079 Ha Non-Forest land, Total 2.2017 Ha falls within tiger corridor) Forest Land for laying Underground Optical Cable along the road in existing RoW of Katezari to Tekameta in Dhanora & Korchi Tahsil of Dist-Gadchiroli of Maharashtra state under 4G saturation Project of GOI is a proposed road project in Tekameta, Korchi, Gadchiroli, Maharashtra. The site covers 3.7 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Tekameta, Korchi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 8 May 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 8 May 2024 |
| Application filed | 8 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mahesh Nair |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Tekameta |
| Taluk / tehsil | Korchi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16613 |
In context
69 applications in Gadchiroli since January 2022 are in the same category (Roads & highways): 3 approved, 47 filed or under review, and 19 withdrawn, lapsed or rejected. At 3.7 acres, this one is smaller than 74% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tekameta, Korchi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land 1.5558 Ha (Out of which 1.4044 Ha Forest land and… — more information requested, 0 m away
- Laying Underground Optical Fibre Cable Along The Road In Row Of Mdr-03 From… — more information requested, 400 m away
- Laying Underground Optical Fibre Cable Along The Road in Row of MDR-03 From… — lapsed, 400 m away
- Laying Underground Optical Fiber Cable along the road in ROW of MDR-02 and… — more information requested, 6.7 km away
- usof MAHUSO332 — lapsed, 7.6 km away
- Diversion of 1.2577 Ha. of Forest Land (Out of Which 0.8411 Ha Forest Land… — more information requested, 7.6 km away
- Usof Mahuso062 — lapsed, 12.3 km away
- Laying Underground Optical Fiber Cable along the road in RoW of MDR-02 and… — more information requested, 14.5 km away
More from Mahesh Nair in Gadchiroli
- Diversion of 0.9871Ha Forest Land (out of which 0.82997Ha Forest land and… — more information requested
- Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst… — more information requested
- Wildlife Clearance for 0.0769 Ha. Non Forest Land (which falls within tiger… — more information requested
- Diversion of 0.0156 Ha. (Out of which 0.0156 Ha Forest land and 0.0617 Ha… — more information requested
- Diversion of 0.1149 Ha. (Which Falls Within Tiger Corridor) Forest Land for… — more information requested
- Diversion of 1.1497 Ha. (Out of which 0.8704 Ha Forest land and 0.6055 Ha… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.