One of 3 filings for this project. The project's main page, with every filing and where each stands: Pimpalpada Savale Pumped Storage Project
Project details
| Status | Initial checks |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Chambery Power private limited |
| Land area | 1,967.4 acres (796.2 ha) |
| Forest land | 1,500 m² |
| Project cost | ₹10,217.4 crore |
| Village / locality | Sawale |
| Taluk / tehsil | Mawal |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15025 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Sept 2026 (this page) | Initial checks | 1,967.4 acres | ₹10,217.4 crore |
| New project filed 8 Sept 2026 | Initial checks | 1,967.4 acres | ₹10,217.4 crore |
| Early planning filed 18 Jun 2026 | Under environmental review | 1,967.4 acres | ₹10,217.4 crore |
In context
21 applications in Pune since January 2022 are in the same category (Other): 1 approved, 15 filed or under review, and 5 withdrawn, lapsed or rejected. At 1,967.4 acres, this one is larger than 62% of them.
Where it is
Sawale, Mawal, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pimpalpada Savale Pumped Storage Project — under environmental review, 0 m away
- Pimpalpada Savale Pumped Storage Project — initial checks, 0 m away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — environmental approval granted, 9.1 km away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — forest land use approved, 9.1 km away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — cleared for impact study, 9.1 km away
- Diversion of Forest Land for construction of road linking Bhimashankar SH60… — more information requested, 9.3 km away
- Diversion of Forest Land for construction of road linking Bhimashankar SH60… — lapsed, 9.4 km away
- Proposed Expansion in Environment Clearance of "Centre for Perfect Health" — environmental approval granted, 10.2 km away
All 3 Chambery Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.