Quick answers
What is this project?
Diversion of Forest Land for Constructional Improvements to Pali Patnus Road SH- 94, Taluka-Sudhagad, Dist. Raigad (M.S.) is a lapsed road project in Potlaj Kh., Sudhagad, Raigarh, Maharashtra. It seeks 0.8 acres of forest land.
Who is building it?
The applicant is Executive Engineer P W Div Alibag.
Has it been approved?
No. The application was lapsed on 7 Mar 2024, so it is no longer under consideration.
Where is it?
In Potlaj Kh., Sudhagad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹5.8 crore and 3,230 m² of forest land.
When was it filed?
The application was filed on 25 Jun 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Mar 2024 |
| Application filed | 25 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer P W Div Alibag |
| Forest land | 3,230 m² |
| Project cost | ₹5.8 crore |
| Village / locality | Potlaj Kh. |
| Taluk / tehsil | Sudhagad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15082 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval.
Where it is
Potlaj Kh., Sudhagad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New pipeline water supply scheme at Ghera Sudhagad Tal- Sudhagad under Jal… — more information requested, 8 km away
- New pipeline water supply scheme at Nagshet (Nenavali) Tal- Sudhagad under Jal… — more information requested, 9.3 km away
- Regularization of the existing manufacturing of Seamless pipes and mother… — lapsed, 9.8 km away
- Seamless pipes and Mother hollow manufacturing industry By M/s. Mahalaxmi… — returned to applicant, 9.8 km away
- Seamless Pipes and Mother hollow manufacturing industry at Pipe Nagar, Sukeli,… — cleared for impact study, 9.8 km away
- Wafeghar Stone Quarry (Owner- Shri. Sanjay Vithal Sagale) — returned to applicant, 10 km away
- Proposed 400/220 KV MC Line from Existing 400 KV DC Padagaon to Nagothane Line… — coastal clearance granted, 10.8 km away
- Environmental Clearance for Basalt Stone quarry of having area 2.00 Ha of… — initial checks, 13.1 km away
More from Executive Engineer P W Div Alibag in Raigarh
- Obtaining Wildlife Clearance for the Forest Land Involved — application filed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.