Quick answers
What is this project?
New pipeline water supply scheme at Ghera Sudhagad Tal- Sudhagad under Jal Jeevan Mission is a proposed pipeline project in Ghera Sudhagad, Sudhagad, Raigarh, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Sanjay Vengurlekar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ghera Sudhagad, Sudhagad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 0 acres.
When was it filed?
The application was filed on 6 Nov 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 Nov 2023 |
| Application filed | 6 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sanjay Vengurlekar |
| Land area | 200 m² |
| Project cost | ₹1.2 crore |
| Village / locality | Ghera Sudhagad |
| Taluk / tehsil | Sudhagad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16371 |
In context
19 applications in Raigarh since January 2022 are in the same category (Pipelines): 4 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Ghera Sudhagad, Sudhagad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wafeghar Stone Quarry (Owner- Shri. Sanjay Vithal Sagale) — returned to applicant, 6 km away
- Diversion of 0.8691 Ha of Forest Land for Use As Road to Enter/Move Out of the… — application filed, 7.3 km away
- Diversion of 0.680 Ha of Forest Land for Use As Approach Road to Enter/Move… — initial checks, 7.3 km away
- Diversion of Forest Land for Constructional Improvements to Pali Patnus Road… — lapsed, 8 km away
- Diversion of forest land for laying of underground OFC duct & cable within RoW… — lapsed, 10.1 km away
- New pipeline water supply scheme at Nagshet (Nenavali) Tal- Sudhagad under Jal… — more information requested, 10.6 km away
- Proposed 400/220 KV MC Line from Existing 400 KV DC Padagaon to Nagothane Line… — coastal clearance granted, 15.8 km away
- Regularization of the existing manufacturing of Seamless pipes and mother… — lapsed, 15.9 km away
More from Sanjay Vengurlekar in Raigarh
- New Drinking Water Supply Pipeline in Shridhon Under Jal Jeevan Mission Scheme — more information requested
- New pipeline water supply scheme at Nagshet (Nenavali) Tal- Sudhagad under Jal… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.