Quick answers
What is this project?
33 KV D/C Overhead Transmission Line from Suzlon Existing 33kV Double Pole is a proposed building project in Gangapur, Nandurbar, Maharashtra. The site covers 28 acres.
Who is building it?
The applicant is Graphite India Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Gangapur, Nandurbar, Maharashtra.
How big is it?
It has a stated cost of ₹150 crore; a site of 28 acres and 3.1 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 7 Jan 2023.
Project details
| Official title | Construction of 33 KV D/C Overhead Transmission Line from Suzlon Existing 33kV Double Pole at Gangapur village to the proposed 33kV Double Pole at Nandarkhe, Dhudhale, Pimpri, Villages of Nandurbar Forest Division of Maharashtra State for the Wind Power Project |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 29 Sept 2025 |
| Application filed | 7 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Graphite India Limited |
| Land area | 28 acres (11.4 ha) |
| Forest land | 3.1 acres (1.2 ha) |
| Project cost | ₹150 crore |
| Village / locality | Gangapur |
| Taluk / tehsil | Nandurbar |
| District | Nandurbar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15093 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangapur, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — more information requested, 4.1 km away
- Project by Vijay Suraksha Realty LLP — lapsed, 5.3 km away
- Shri Ganeshbhai Dilipbhai Patil- Baslat Stone Quarry (Area 2.00 Ha) at Gut No.… — environmental approval granted, 7.5 km away
- 100 Seated Government Medical College, 500 Bedded Hospital and Allied… — environmental approval granted, 7.7 km away
- Agrochemicals and Organic Chemicals Manufacturing Unit by M/s OFB Tech Limited — under environmental review, 12.4 km away
- Agrochemicals and Organic Chemicals Manufacturing Unit by M/s OFB Tech Limited — cleared for impact study, 12.4 km away
- Storage Tank at Asane Tal. & Dist. Nandurbar Maharashtra — under forest review, 13.4 km away
- Proposed expansion of existing molasses based distillery unit from 100 KLPD to… — cleared for impact study, 21.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.