Quick answers
What is this project?
Diversion of 0.0165 Ha. of Forest Land for Laying Underground Irrigation Water Pipeline (Gat No.23 Mhasala) Project is a lapsed water and irrigation project in Gopalpur, Nagpur (Rural), Nagpur, Maharashtra. The site covers 0.7 acres.
Who is building it?
The applicant is Sambhaji Kadupatil.
Has it been approved?
No. The application was lapsed on 13 Nov 2025, so it is no longer under consideration.
Where is it?
In Gopalpur, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 0.7 acres and 170 m² of forest land.
When was it filed?
The application was filed on 12 Jun 2025.
Project details
| Official title | Proposal for Diversion of 0.0165 Ha. of Forest Land for Laying Underground Irrigation Water Pipeline (Gat No.23 Mhasala) Project in Nagpur District Under Nagpur Forest Division in the State of Maharashtra |
|---|---|
| Status | Lapsed |
| Status since | 13 Nov 2025 |
| Application filed | 12 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Sambhaji Kadupatil |
| Land area | 2,800 m² |
| Forest land | 170 m² |
| Project cost | ₹1.4 crore |
| Village / locality | Gopalpur |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15159 |
In context
8 applications in Nagpur since January 2022 are in the same category (Water & irrigation): 3 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopalpur, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0165 ha. of Forest Land for laying Underground irrigation water… — more information requested, 50 m away
- Diversion of 0.05 Ha of Forest Land for Laying Underground Irrigation Water… — more information requested, 50 m away
- Diversion of 0.0104 ha of forest land for underground Natural Gas Pipeline… — under forest review, 2.5 km away
- Proposed "Unit 3" steel manufacturing industry by Shardashree Ispat Limited — cleared for impact study, 5.8 km away
- Proposed Expansion of Rolling Mill-Conversion of Billets into Structural Steel… — cleared for impact study, 6.1 km away
- Proposed SSP/Fortified (Zincated/Boronated) SSP, GSSP/Fortified… — environmental approval granted, 7.3 km away
- Proposed industrial shed for installation of Integrated Solar cell and Solar… — withdrawn, 7.4 km away
- Integrated 3 GW Solar cell and 1.5 GW Solar Module line plant, at Survey No.… — withdrawn, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.