Quick answers
What is this project?
Diversion of 0.05 Ha of Forest Land for Laying Underground Irrigation Water Pipeline (Gat No.23 Mhasala) Project is a proposed pipeline project in Mhasala, Nagpur (Rural), Nagpur, Maharashtra. The site covers 1.3 acres.
Who is building it?
The applicant is Dnyaneshwar Shankarrao Pawar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Mhasala, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Official title | Proposal for Diversion of 0.05 Ha of Forest Land for Laying Underground Irrigation Water Pipeline (Gat No.23 Mhasala) Project in Nagpur District Under Nagpur Forest Division in the State of Maharashtra |
|---|---|
| Status | More information requested |
| Status since | 9 Apr 2025 |
| Application filed | 9 Apr 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Dnyaneshwar Shankarrao Pawar |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Mhasala |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16753 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mhasala, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0165 Ha. of Forest Land for Laying Underground Irrigation Water… — lapsed, 50 m away
- Diversion of 0.0165 ha. of Forest Land for laying Underground irrigation water… — more information requested, 100 m away
- Diversion of 0.0104 ha of forest land for underground Natural Gas Pipeline… — under forest review, 2.6 km away
- Proposed "Unit 3" steel manufacturing industry by Shardashree Ispat Limited — cleared for impact study, 5.8 km away
- Proposed Expansion of Rolling Mill-Conversion of Billets into Structural Steel… — cleared for impact study, 6.1 km away
- Proposed SSP/Fortified (Zincated/Boronated) SSP, GSSP/Fortified… — environmental approval granted, 7.3 km away
- Proposed industrial shed for installation of Integrated Solar cell and Solar… — withdrawn, 7.4 km away
- Integrated 3 GW Solar cell and 1.5 GW Solar Module line plant, at Survey No.… — withdrawn, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.