Project details
| Official title | Proposal for the diversion of 3.5000 ha Forest Land for Construction of New Glass Skywalk and Identification & Development of Tourist Spots in Malshej Ghat section (Km 84/0 to Km 95/750 of Kalyan–Murbad–Nirmal Road NH-61), District Thane, Maharashtra. By Executive Engineer, National Highway Division, Thane |
|---|---|
| Status | Initial checks |
| Status since | 29 Jul 2026 |
| Application filed | 29 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Tranport and Highways Government of India New Delhi |
| Land area | 4.5 acres (1.8 ha) |
| Forest land | 8.6 acres (3.5 ha) |
| Project cost | ₹275 crore |
| Village / locality | Thitabi Tarf Vaishakhare |
| Taluk / tehsil | Murbad |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15197 |
In context
53 applications in Thane since January 2022 are in the same category (Roads & highways): 13 approved, 19 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 4.5 acres, this one is smaller than 61% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thitabi Tarf Vaishakhare, Murbad, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation and Up-Gradation of Existing Kalyan-Nirmal National Highway… — lapsed, 1.2 km away
- The diversion of forest Land of Laying Underground OFC along the existing… — lapsed, 10.2 km away
- The diversion of forest Land of Laying Underground OFC along the existing… — lapsed, 10.2 km away
- Up-Gradation to Four Lane/ Two Lane With Paved Shoulders Configuration of… — lapsed, 13.2 km away
- Up-Gradation to Four Lane/ Two Lane With Paved Shoulders Configuration of… — in-principle approval, conditions pending, 19 km away
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study, 22.6 km away
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — under forest review, 22.6 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 24.7 km away
All 46 Ministry of Road Tranport and Highways Government of India New Delhi projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.