What is Developing? Open the mapMap

In-principle approval, conditions pendingIndustry · Gadchiroli, Maharashtra

Re-Diversion Proposal of Forest Land over 8.853 ha for laying Underground Water Pipeline within the Right of Way (RoW) of Existing Road from village Bhamragarh under Bhamragarh Tahasil to village Hedri under Etapalli Tahasil of Gadchiroli District under Jurisdiction of Bhamragarh Forest Division in favour of M/s Lloyds Metals and Energy Limited.

Re-Diversion Proposal of Forest Land over 8.853 ha for laying Underground Water Pipeline within the Right of Way (RoW) of Existing Road from village Bhamragarh under Bhamragarh Tahasil to village Hedri under Etapalli Tahasil of Gadchiroli District under Jurisdiction of Bhamragarh Forest Division in favour of M/s Lloyds Metals and Energy Limited is a proposed industrial project in Bhamaragad, Bhamragad, Gadchiroli, Maharashtra. The site covers 24.2 acres. Its stated project cost is ₹134 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 29 Oct 2025).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Re-Diversion Proposal of Forest Land over 8.853 ha for laying Underground Water Pipeline within the Right of Way (RoW) of Existing Road from village Bhamragarh under Bhamragarh Tahasil to village Hedri under Etapalli Tahasil of Gadchiroli District under Jurisdiction of Bhamragarh Forest Division in favour of M/s Lloyds Metals and Energy Limited is a proposed industrial project in Bhamaragad, Bhamragad, Gadchiroli, Maharashtra. The site covers 24.2 acres.

Who is building it?

The applicant is Lloyds Metals and Energy Limited.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Bhamaragad, Bhamragad, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹134 crore; a site of 24.2 acres and 21.9 acres (8.9 ha) of forest land.

When was it filed?

The application was filed on 13 Jan 2025.

Project details

StatusIn-principle approval, conditions pending
Status since29 Oct 2025
Application filed13 Jan 2025
Approval soughtForest land use
Application typeChange of use
SectorIndustry
ApplicantLloyds Metals and Energy Limited
Land area24.2 acres (9.8 ha)
Forest land21.9 acres (8.9 ha)
Project cost₹134 crore
Village / localityBhamaragad
Taluk / tehsilBhamragad
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15246

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.2 acres, this one is smaller than 93% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhamaragad, Bhamragad, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lloyds Metals and Energy Limited in Gadchiroli

29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.