Environmental approval grantedMining · Gadchiroli, Maharashtra

Expansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45 MTPA BHQ (Banded Hematite Quartzite), 5 MTPA Waste (Total Excavation: 60.0 MTPA)

Expansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45 MTPA BHQ (Banded Hematite Quartzite), 5 MTPA Waste (Total Excavation: 60.0 MTPA) is an approved mining project in Surjagad, Etapalli, Gadchiroli, Maharashtra. The site covers 860.1 acres. Its stated project cost is ₹1,713.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Jun 2025).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45 MTPA BHQ (Banded Hematite Quartzite), 5 MTPA Waste (Total Excavation: 60.0 MTPA) is an approved mining project in Surjagad, Etapalli, Gadchiroli, Maharashtra. The site covers 860.1 acres.

Who is building it?

The applicant is Lloyds Metals and Energy Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Jun 2025), as of 27 Nov 2026.

Where is it?

In Surjagad, Etapalli, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹1,713.6 crore and a site of 860.1 acres.

When was it filed?

The application was filed on 10 Feb 2025.

Project details

Official titleExpansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45 MTPA BHQ (Banded Hematite Quartzite), 5 MTPA Waste (Total Excavation: 60.0 MTPA) along with crushing and screening plant at Surjagarh Iron Ore Mine lease area of 348.09 Ha., located near Village Surjagarh, Tehsil Etapali, District Gadchiroli, Maharashtra of M/s. Lloyds Metals & Energy Ltd.
StatusEnvironmental approval granted
Status since25 Jun 2025
Application filed10 Feb 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantLloyds Metals and Energy Limited
Land area860.1 acres (348.1 ha)
Project cost₹1,713.6 crore
Village / localitySurjagad
Taluk / tehsilEtapalli
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-08902

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 10 Feb 2025 (this page)Environmental approval granted860.1 acres₹1,713.6 crore
Early planning filed 2 Aug 2024Cleared for impact study860.1 acres₹1,713.6 crore

In context

246 applications in Gadchiroli since January 2022 are in the same category (Mining): 227 approved, 16 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 18 days from filing to approval. At 860.1 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Surjagad, Etapalli, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lloyds Metals and Energy Limited in Gadchiroli

29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.