What is Developing? Open the mapMap

LapsedBuildings & townships · Gadchiroli, Maharashtra

Diversion of 468.000 Ha. Forest Land for Logistic Integrated Facility of Systematic Recovery of Natural Resources From Low Grade Iron Ore (Hematite Quartzite) From Adjacent Existing Mine From Surjagad Village by M/S Surjagad Ispat Pvt.Ltd

Diversion of 468.000 Ha. Forest Land for Logistic Integrated Facility of Systematic Recovery of Natural Resources From Low Grade Iron Ore (Hematite Quartzite) From Adjacent Existing Mine From Surjagad Village by M/S Surjagad Ispat Pvt.Ltd is a lapsed building project in Reserved Forest, Mulchera, Gadchiroli, Maharashtra. The site covers 1,156.5 acres. Its stated project cost is ₹305.9 crore. As of 27 Nov 2026, its status is “Lapsed” (since 16 Apr 2026).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 468.000 Ha. Forest Land for Logistic Integrated Facility of Systematic Recovery of Natural Resources From Low Grade Iron Ore (Hematite Quartzite) From Adjacent Existing Mine From Surjagad Village by M/S Surjagad Ispat Pvt.Ltd is a lapsed building project in Reserved Forest, Mulchera, Gadchiroli, Maharashtra. The site covers 1,156.5 acres.

Who is building it?

The applicant is Surjagad Ispat Private Limited.

Has it been approved?

No. The application was lapsed on 16 Apr 2026, so it is no longer under consideration.

Where is it?

In Reserved Forest, Mulchera, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹305.9 crore; a site of 1,156.5 acres and 1,156.5 acres (468 ha) of forest land.

When was it filed?

The application was filed on 27 Nov 2025.

Project details

Official titleProposal for Diversion of 468.000 Ha. Forest Land for Logistic Integrated Facility of Systematic Recovery of Natural Resources From Low Grade Iron Ore (Hematite Quartzite) From Adjacent Existing Mine From Surjagad Village in Gadchiroli District of Maharashtra State by M/S Surjagad Ispat Pvt.Ltd.
StatusLapsed
Status since16 Apr 2026
Application filed27 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantSurjagad Ispat Private Limited
Land area1,156.5 acres (468 ha)
Forest land1,156.5 acres (468 ha)
Project cost₹305.9 crore
Village / localityReserved Forest
Taluk / tehsilMulchera
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15272

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Nov 2025 (this page)Lapsed1,156.5 acres₹305.9 crore
New project filed 20 Nov 2025Lapsed1,156.5 acres₹305.9 crore

In context

31 applications in Gadchiroli since January 2022 are in the same category (Buildings & townships): 4 approved, 15 filed or under review, and 12 withdrawn, lapsed or rejected. At 1,156.5 acres, this one is larger than 60% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Reserved Forest, Mulchera, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Surjagad Ispat Private Limited in Gadchiroli

All 9 Surjagad Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.