Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Oct 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Clean Project Private Limited |
| Land area | 9.6 acres (3.9 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹21 crore |
| Village / locality | Nazare Supe |
| Taluk / tehsil | Purandhar |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15537 |
In context
16 applications in Pune since January 2022 are in the same category (Power): 0 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. At 9.6 acres, this one is smaller than 75% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nazare Supe, Purandhar, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 6 - MW Solar Plant MSKVY 2.0 at kalewadi (33/11 KV Deulgaon Substation) — lapsed, 0 m away
- Proposed Expansion in the Manufacturing of Carbon and Alloy Steel Cast Blooms… — returned to applicant, 4.5 km away
- Proposed Expansion in the Manufacturing of Carbon and Alloy Steel Cast Blooms… — more information requested, 4.5 km away
- Diversion of Forest Land for Laying Underground Water Pipeline for Agriculture… — lapsed, 4.9 km away
- Diversion of 0.0465 Ha. Reserved Forest for Laying Underground Water Pipeline… — in-principle approval, conditions pending, 5 km away
- Proposed Synthetic Organic Chemicals- Active Pharmaceutical Ingredients (API)… — environmental approval granted, 5.8 km away
- Proposed Synthetic Organic Chemicals- Active Pharmaceutical Ingredients (API)… — cleared for impact study, 5.8 km away
- Proposed Synthetic Organic Chemicals- Active Pharmaceutical Ingredients (API)… — lapsed, 5.9 km away
More from Avaada Clean Project Private Limited in Pune
- 10 MW Solar Plant MSKVY 2.0 at Bapudi (Loni devkar substation) Taluka -… — lapsed
- 6 - MW Solar Plant MSKVY 2.0 at kalewadi (33/11 KV Deulgaon Substation) — lapsed
- 5 MW Solar Plant MSKVY 2.0 at Karewadi (33/11KV Loni Substation) — lapsed
- 10 MW Solar Plant MSKVY 2.0 at Vyahali 33/11KV Shelgaon Substation) — lapsed
- 1-MW Solar Plant MSKVY 2.0 at Koyali (22KV Koyali Substation) — lapsed
6 Avaada Clean Project projects in Pune
All 10 Avaada Clean Project projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.