Quick answers
What is this project?
Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of Existing Road Chikhalgad – Sawali in Favour of Reliance Jio Infocomm LTD is a lapsed telecom project in Girat, Manora, Washim, Maharashtra. It seeks 1.2 acres of forest land.
Who is building it?
The applicant is Reliance Jio Infocomm Limited.
Has it been approved?
No. The application was lapsed on 12 Sept 2023, so it is no longer under consideration.
Where is it?
In Girat, Manora, Washim, Maharashtra.
How big is it?
It has a stated cost of ₹23 lakh and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 8 Sept 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of Existing…
Project details
| Official title | Proposal for Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of Existing Road Chikhalgad – Sawali in Favour of Reliance Jio Infocomm LTD. in District Washim and Yavatmal in the State of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 12 Sept 2023 |
| Application filed | 8 Sept 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Limited |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹23 lakh |
| Village / locality | Girat |
| Taluk / tehsil | Manora |
| District | Washim |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15851 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Dec 2023 | Lapsed | ₹23 lakh | |
| New project filed 8 Sept 2022 (this page) | Lapsed | ₹23 lakh |
In context
23 applications in Washim since January 2022 are in the same category (Telecom): 1 approved, 12 filed or under review, and 10 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Girat, Manora, Washim, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — lapsed, 0 m away
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — more information requested, 1.9 km away
- Bharti Airtel Ltd-0.4634 Ha. Diversion of Forest Land for Laying Underground… — lapsed, 4.7 km away
- Re-Diversion of forest land for underground OFC duct and cable within ROW of… — more information requested, 5 km away
- 4G Saturation Project OF Central Government — lapsed, 9 km away
- Re-Diversion of Forest Land in Favour of Vodafone Idea Telecom Infrastructure… — lapsed, 10.5 km away
- Re-Diversion of 0.0865 Ha Forest Land in Favour of Vodafone Idea Telecom… — under forest review, 11.1 km away
- Re-appraisal of Environmental Clearance for Stone Quarry Project (Area 1.57… — environmental approval granted, 12.9 km away
More from Reliance Jio Infocomm Limited in Washim
- Laying Underground OFC along the existing Right of Way of Washim - Mangrulpir… — more information requested
- Proposal of Laying Underground OFC along the existing Right of Way of Patur to… — lapsed
- Diversion Of Forest Land For Laying Optical Fiber Cable Within Row Of The… — more information requested
- Laying underground Optical Fiber Cable within RoW of Existing Road from… — more information requested
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — more information requested
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — more information requested
11 Reliance Jio Infocomm (Jio) projects in Washim
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.