Quick answers
What is 4G Saturation Project OF Central Government?
4G Saturation Project OF Central Government is a lapsed telecom project in Shendurjana (A), Manora, Washim, Maharashtra. It seeks 0.1 acres of forest land.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Shendurjana (A), Manora, Washim, Maharashtra.
How big is it?
It has a stated cost of ₹25 lakh and 480 m² of forest land.
When was it filed?
The application was filed on 18 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 18 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Forest land | 480 m² |
| Project cost | ₹25 lakh |
| Village / locality | Shendurjana (A) |
| Taluk / tehsil | Manora |
| District | Washim |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16202 |
In context
23 applications in Washim since January 2022 are in the same category (Telecom): 1 approved, 12 filed or under review, and 10 withdrawn, lapsed or rejected.
Where it is
Shendurjana (A), Manora, Washim, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel Ltd-0.4634 Ha. Diversion of Forest Land for Laying Underground… — lapsed, 6.1 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — more information requested, 7.2 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — lapsed, 9 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Passing Through Row of… — lapsed, 9 km away
- Re-Diversion of forest land for underground OFC duct and cable within ROW of… — more information requested, 10.6 km away
- Laying Underground OFC along the existing Right of Way of Washim - Mangrulpir… — more information requested, 16.4 km away
- Re-Diversion of Forest Land in Favour of Vodafone Idea Telecom Infrastructure… — lapsed, 17.3 km away
- 4G Saturation Project OF Central Government -1 — lapsed, 17.4 km away
More from Bharat Sanchar Nigam Limited in Washim
- Govrt Of India 4G Saturation Project Executed By BSNL, OFC Passing Through… — more information requested
- 4G Saturation Project OF Central Government -1 — lapsed
3 Bharat Sanchar Nigam (BSNL) projects in Washim
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.