What is this project?
4g Saturation Project_forest Land_gurnoli_kurkheda_gadchiroli_bsnl is a lapsed project in Gurnoli, Kurkheda, Gadchiroli, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Gurnoli, Kurkheda, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹85 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 19 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 19 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹85 lakh |
| Village / locality | Gurnoli |
| Taluk / tehsil | Kurkheda |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15870 |
In context
59 applications in Gadchiroli since January 2022 are in the same category (Other): 3 approved, 4 filed or under review, and 52 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gurnoli, Kurkheda, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of 25.701 Ha Forest Land for "up Gradation of Existing Highway… — more information requested, 1.8 km away
- The Diversion of 25.701 Ha Forest Land for "up Gradation of Existing Highway… — lapsed, 1.8 km away
- Construction / Widening of Road Including Approach Road to Roadside… — lapsed, 1.9 km away
- Transfer of Environmental Clearance of Aandhali Sand Ghat (1.0 Ha), Gadchiroli… — environmental approval granted, 2.1 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 2.1 km away
- The diversion of 20.171 Ha forest land for "Up gradation of Existing Highway… — under wildlife review, 2.1 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 2.2 km away
- Transfer of Environmental Clearance of Saytola Sand Ghat (1.0 Ha), Gadchiroli… — environmental approval granted, 3.3 km away
More from Mahesh Nair in Gadchiroli
- Diversion of 0.9871Ha Forest Land (out of which 0.82997Ha Forest land and… — more information requested
- Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst… — more information requested
- Wildlife Clearance for 0.0769 Ha. Non Forest Land (which falls within tiger… — more information requested
- Diversion of 0.0156 Ha. (Out of which 0.0156 Ha Forest land and 0.0617 Ha… — more information requested
- Diversion of 0.1149 Ha. (Which Falls Within Tiger Corridor) Forest Land for… — more information requested
- Diversion of 1.1497 Ha. (Out of which 0.8704 Ha Forest land and 0.6055 Ha… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.