What is Developing? Open the mapMap

More information requestedBuildings & townships · Gadchiroli, Maharashtra

Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst Land falls under Pranhita WL Sanctuary, ESZ and Telemetry Corridor) forest Land laying of underground Optical Fiber Cable along the road in ROW of existing roads: Repanpalli to Umanoor S - Krishtapur(S), Bhaswapur via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(s), Raspalli(S), Yerragadda, Umanur S, Suddagudam, Joganguda M in Dist-Gadchiroli (MH) for connecting LWE villages under 4G Saturation project of GOI.

Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst Land falls under Pranhita WL Sanctuary, ESZ and Telemetry Corridor) forest Land laying of underground Optical Fiber Cable along the road in ROW of existing roads: Repanpalli to Umanoor S - Krishtapur(S), Bhaswapur via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(s), Raspalli(S), Yerragadda, Umanur S, Suddagudam, Joganguda M in Dist-Gadchiroli (MH) for connecting LWE villages under 4G Saturation project of GOI is a proposed building project in Arkapalli, Aheri, Gadchiroli, Maharashtra. Its stated project cost is ₹83 lakh. As of 27 Nov 2026, its status is “More information requested” (since 22 Apr 2025).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst Land falls under Pranhita WL Sanctuary, ESZ and Telemetry Corridor) forest Land laying of underground Optical Fiber Cable along the road in ROW of existing roads: Repanpalli to Umanoor S - Krishtapur(S), Bhaswapur via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(s), Raspalli(S), Yerragadda, Umanur S, Suddagudam, Joganguda M in Dist-Gadchiroli (MH) for connecting LWE villages under 4G Saturation project of GOI is a proposed building project in Arkapalli, Aheri, Gadchiroli, Maharashtra.

Who is building it?

The applicant is Mahesh Nair.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Arkapalli, Aheri, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹83 lakh.

When was it filed?

The application was filed on 22 Apr 2025.

Project details

StatusMore information requested
Status since22 Apr 2025
Application filed22 Apr 2025
Approval soughtWildlife review
Application typeNew project
SectorBuildings & townships
ApplicantMahesh Nair
Project cost₹83 lakh
Village / localityArkapalli
Taluk / tehsilAheri
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16650

In context

31 applications in Gadchiroli since January 2022 are in the same category (Buildings & townships): 4 approved, 15 filed or under review, and 12 withdrawn, lapsed or rejected.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Arkapalli, Aheri, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mahesh Nair in Gadchiroli

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.