Quick answers
What is this project?
Forest Diversion Proposal Over 0.343 Ha (Fresh Forest) for Intake Well & Pump House on Pamulgauami River (Indravati River) and Underground Water Pipeline From Pump House to Zero Point of Right of Way (Row) of Existing Road (116.44 Mtrs) to Connect Proposed Underground Water Pipeline is an approved industrial project in Bhamaragad, Bhamragad, Gadchiroli, Maharashtra. The site covers 0.8 acres.
Who is building it?
The applicant is Lloyds Metals and Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 Jan 2026), as of 27 Nov 2026.
Where is it?
In Bhamaragad, Bhamragad, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹22 crore; a site of 0.8 acres and 3,430 m² of forest land.
When was it filed?
The application was filed on 13 Jan 2025.
Project details
| Official title | Forest Diversion Proposal Over 0.343 Ha (Fresh Forest) for Intake Well & Pump House on Pamulgauami River (Indravati River) and Underground Water Pipeline From Pump House to Zero Point of Right of Way (Row) of Existing Road (116.44 Mtrs) to Connect Proposed Underground Water Pipeline in Village Bhamragarh Under Bhamragarh Tahasil of Gadchiroli District Under Jurisdiction of Bhamragarh Forest Division in Favour of M/S Lloyds Metals and Energy Limited. |
|---|---|
| Status | Forest land use approved |
| Status since | 12 Jan 2026 |
| Application filed | 13 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Lloyds Metals and Energy Limited |
| Land area | 3,400 m² |
| Forest land | 3,430 m² |
| Project cost | ₹22 crore |
| Village / locality | Bhamaragad |
| Taluk / tehsil | Bhamragad |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15920 |
In context
30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.8 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhamaragad, Bhamragad, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying Underground Optical Fibre Cable along the road in ROW of NH-130D from… — more information requested, 4.3 km away
- Usof Mahuso134 — lapsed, 6.6 km away
- USOF MAHUSO130 Hindur — lapsed, 6.8 km away
- Aop Pengunda — more information requested, 10.5 km away
- Aop Pengunda — lapsed, 10.5 km away
- Aop Pengunda — more information requested, 10.6 km away
- Usof Mahuso121 Halver — lapsed, 11.1 km away
- USOF Dobhur_MAHUSO074 — lapsed, 11.4 km away
More from Lloyds Metals and Energy Limited in Gadchiroli
- Proposed expansion by Thickening & Filtration Unit from 10 to 10.6 MTPA &… — under environmental review
- Proposed Industrial Township Project 'LLOYDS WAINGANGA RESORT' at Aldandi,… — under environmental review
- Re-Diversion Proposal Over 8.701 Ha of Forest Land Required for Laying… — lapsed
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted
- Expansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45… — environmental approval granted
29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.