Quick answers
What is Providing New Water Supply Scheme?
Providing New Water Supply Scheme is a proposed building project in Baliware, Karjat, Raigarh, Maharashtra. The site covers 132.6 acres.
Who is building it?
The applicant is Jagdish Bankari.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Baliware, Karjat, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 132.6 acres.
When was it filed?
The application was filed on 16 Aug 2023.
Project details
| Official title | Providing New Water Supply Scheme in Siddhagad village and other padas in Thane district through Jal Jeevan mission |
|---|---|
| Status | Under wildlife review |
| Status since | 16 Aug 2023 |
| Application filed | 16 Aug 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jagdish Bankari |
| Land area | 132.6 acres (53.7 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Baliware |
| Taluk / tehsil | Karjat |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16368 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 132.6 acres, this one is larger than 94% of them.
Where it is
Baliware, Karjat, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Poshir Project Taluka Karjat District Raigad — more information requested, 8.5 km away
- Diversion of Forest Area for the Project of Construction of Ropeway — more information requested, 9.7 km away
- Diversion of Forest Area for the Project of Construction of Ropeway — lapsed, 9.7 km away
- Salokh Tarf Waredi Stone quarry — lapsed, 13.4 km away
- Environmental Clearance for the proposed stone quarry of Shri. Sarfaraj Abdul… — environmental approval granted, 13.4 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — environmental approval granted, 15.4 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — cleared for impact study, 15.4 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — lapsed, 15.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.