Quick answers
What is this project?
Diversion of Forest Area for the Project of Construction of Ropeway is a proposed project in Ambherpada, Karjat, Raigarh, Maharashtra. The site covers 1,999.8 acres.
Who is building it?
The applicant is Shri Bhimashankar Ropeway Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ambherpada, Karjat, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹101.7 crore and a site of 1,999.8 acres.
When was it filed?
The application was filed on 21 Apr 2026.
Project details
| Official title | Diversion of Forest Area for the Project of Construction of Ropeway at Bhimashankar District Pune. |
|---|---|
| Status | More information requested |
| Status since | 21 Apr 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Shri Bhimashankar Ropeway Private Limited |
| Land area | 1,999.8 acres (809.3 ha) |
| Project cost | ₹101.7 crore |
| Village / locality | Ambherpada |
| Taluk / tehsil | Karjat |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16811 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Apr 2026 (this page) | More information requested | 1,999.8 acres | ₹101.7 crore |
| New project filed 5 Apr 2026 | Lapsed | 1,999.8 acres | ₹101.7 crore |
In context
78 applications in Raigarh since January 2022 are in the same category (Other): 17 approved, 38 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,999.8 acres, this one is larger than 95% of them.
Where it is
Ambherpada, Karjat, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Area for the Project of Construction of Ropeway — lapsed, 0 m away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — environmental approval granted, 7.7 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — cleared for impact study, 7.7 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — lapsed, 7.7 km away
- Proposed 3 KLPD Mahua Flower Based Heritage Liquor Manufacturing Unit &… — not approved, 7.7 km away
- Poshir Project Taluka Karjat District Raigad — more information requested, 9.5 km away
- Providing New Water Supply Scheme — under wildlife review, 9.7 km away
- Shilar Project — under forest review, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.