What is Developing? Open the mapMap

More information requestedBuildings & townships · Gadchiroli, Maharashtra

Diversion of 0.8913ha (Out of Which 0.2269ha Falls Under Pranhita Wl Sanctuary) Forest Land Laying of Underground Optical Fiber Cable Along the Road in Row of Existing Roads: Repanpalli to the Boundary of Krishtapur(S) Via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(S), Raspalli(S) in Dist-Gadchiroli (Mh) for Connecting Lwe Villages Under 4g Saturation Project of Govt. of India

Diversion of 0.8913ha (Out of Which 0.2269ha Falls Under Pranhita Wl Sanctuary) Forest Land Laying of Underground Optical Fiber Cable Along the Road in Row of Existing Roads: Repanpalli to the Boundary of Krishtapur(S) Via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(S), Raspalli(S) in Dist-Gadchiroli (Mh) for Connecting Lwe Villages Under 4g Saturation Project of Govt. of India is a proposed building project in Reserved Forest, Aheri, Gadchiroli, Maharashtra. The site covers 2.4 acres. Its stated project cost is ₹98 lakh. As of 27 Nov 2026, its status is “More information requested” (since 12 Mar 2024).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.8913ha (Out of Which 0.2269ha Falls Under Pranhita Wl Sanctuary) Forest Land Laying of Underground Optical Fiber Cable Along the Road in Row of Existing Roads: Repanpalli to the Boundary of Krishtapur(S) Via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(S), Raspalli(S) in Dist-Gadchiroli (Mh) for Connecting Lwe Villages Under 4g Saturation Project of Govt. of India is a proposed building project in Reserved Forest, Aheri, Gadchiroli, Maharashtra. The site covers 2.4 acres.

Who is building it?

The applicant is Mahesh Nair.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Reserved Forest, Aheri, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹98 lakh and a site of 2.4 acres.

When was it filed?

The application was filed on 12 Mar 2024.

Project details

Official titleProposal for Diversion of 0.8913ha (Out of Which 0.2269ha Falls Under Pranhita Wl Sanctuary) Forest Land Laying of Underground Optical Fiber Cable Along the Road in Row of Existing Roads: Repanpalli to the Boundary of Krishtapur(S) Via Gundera(S), Arkapalli, Govindgaon, Jimalgatta(S), Raspalli(S) in Dist-Gadchiroli (Mh) for Connecting Lwe Villages Under 4g Saturation Project of Govt. of India.
StatusMore information requested
Status since12 Mar 2024
Application filed12 Mar 2024
Approval soughtWildlife review
Application typeNew project
SectorBuildings & townships
ApplicantMahesh Nair
Land area2.4 acres (1 ha)
Project cost₹98 lakh
Village / localityReserved Forest
Taluk / tehsilAheri
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16485

In context

31 applications in Gadchiroli since January 2022 are in the same category (Buildings & townships): 4 approved, 15 filed or under review, and 12 withdrawn, lapsed or rejected. At 2.4 acres, this one is smaller than 93% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Reserved Forest, Aheri, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mahesh Nair in Gadchiroli

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.