Quick answers
What is this project?
Diversion of 0.1277ha (Out of Which 0.0630 Ha Forest Land and 0.0359ha Non-Forest Land , Total 0.0988ha Land Falls Within Tiger Corridor) Forest Land for Laying Underground Optical Cable Along the Road in Existing Row of Usegaon to Shivrajpur Chak, in Wadsa, Tahsil of Dist-Gadchiroli in Maharashtra State, Under 4g Saturation Project of Goi is a proposed road project in Kondhala, Desaiganj (Vadasa), Gadchiroli, Maharashtra. The site covers 0.4 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kondhala, Desaiganj (Vadasa), Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹14 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 18 Apr 2024.
Project details
| Official title | Proposal for Diversion of 0.1277ha (Out of Which 0.0630 Ha Forest Land and 0.0359ha Non-Forest Land , Total 0.0988ha Land Falls Within Tiger Corridor) Forest Land for Laying Underground Optical Cable Along the Road in Existing Row of Usegaon to Shivrajpur Chak, in Wadsa, Tahsil of Dist-Gadchiroli in Maharashtra State, Under 4g Saturation Project of Goi |
|---|---|
| Status | Under wildlife review |
| Status since | 18 Apr 2024 |
| Application filed | 18 Apr 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mahesh Nair |
| Land area | 1,800 m² |
| Project cost | ₹14 lakh |
| Village / locality | Kondhala |
| Taluk / tehsil | Desaiganj (Vadasa) |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16530 |
In context
69 applications in Gadchiroli since January 2022 are in the same category (Roads & highways): 3 approved, 47 filed or under review, and 19 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 94% of them.
Where it is
Kondhala, Desaiganj (Vadasa), Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EC Transfer of Kondhala (Sindari ghat) Sand Ghat, Area 1.36 ha, Gut. no. 280,… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 6.2 km away
- Transfer of EC of Kurud sand ghat on Wainganga River Tq. Desaiganj Dist.… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 6.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 6.2 km away
More from Mahesh Nair in Gadchiroli
- Diversion of 0.9871Ha Forest Land (out of which 0.82997Ha Forest land and… — more information requested
- Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst… — more information requested
- Wildlife Clearance for 0.0769 Ha. Non Forest Land (which falls within tiger… — more information requested
- Diversion of 0.0156 Ha. (Out of which 0.0156 Ha Forest land and 0.0617 Ha… — more information requested
- Diversion of 0.1149 Ha. (Which Falls Within Tiger Corridor) Forest Land for… — more information requested
- Diversion of 1.1497 Ha. (Out of which 0.8704 Ha Forest land and 0.6055 Ha… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.