Quick answers
What is this project?
Wildlife Clearance for Scientific Exploration & Excavation and Systematic Recovery of Iron Ore From Hematite Quartzite From Adjacent Existing Mines Over an Area of 997.507 Ha (Forest – 937.077 Ha & Non-Forest – 60.43 Ha) is a proposed building project in Bande (M), Etapalli, Gadchiroli, Maharashtra. The site covers 2,464.9 acres.
Who is building it?
The applicant is Lloyds Metals and Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Bande (M), Etapalli, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹250 crore and a site of 2,464.9 acres.
When was it filed?
The application was filed on 20 Mar 2024.
Project details
| Official title | Proposal for Wildlife Clearance for Scientific Exploration & Excavation and Systematic Recovery of Iron Ore From Hematite Quartzite From Adjacent Existing Mines Over an Area of 997.507 Ha (Forest – 937.077 Ha & Non-Forest – 60.43 Ha) at Village(S)- Hedri, Bande and Parsulgondi, Tahasil – Etapalli, District Gadchiroli, in Favour of M/S. Lloyds Metals and Energy Limited" |
|---|---|
| Status | Under wildlife review |
| Status since | 20 Mar 2024 |
| Application filed | 20 Mar 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Lloyds Metals and Energy Limited |
| Land area | 2,464.9 acres (997.5 ha) |
| Project cost | ₹250 crore |
| Village / locality | Bande (M) |
| Taluk / tehsil | Etapalli |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16600 |
In context
31 applications in Gadchiroli since January 2022 are in the same category (Buildings & townships): 4 approved, 15 filed or under review, and 12 withdrawn, lapsed or rejected. At 2,464.9 acres, this one is larger than 80% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bande (M), Etapalli, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Diversion of 937.077 Ha. Forest Land for Scientific Exploration &… — forest land use approved, 0 m away
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted, 0 m away
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted, 0 m away
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — cleared for impact study, 0 m away
- BHQ Benification Plant of Lloyds Metals & Energy Limited — lapsed, 50 m away
- Wildlife Clearance for Laying Out Conveyor — more information requested, 1.6 km away
- FOREST DIVERSION OF 19.227 HA FOREST LAND FOR ABOVE GROUND CONVEYOR ALONGWITH… — in-principle approval, conditions pending, 1.6 km away
- Laying Underground Optical Fibre Cable along the road in ROW of… — in-principle approval, conditions pending, 1.9 km away
More from Lloyds Metals and Energy Limited in Gadchiroli
- Proposed expansion by Thickening & Filtration Unit from 10 to 10.6 MTPA &… — under environmental review
- Proposed Industrial Township Project 'LLOYDS WAINGANGA RESORT' at Aldandi,… — under environmental review
- Re-Diversion Proposal Over 8.701 Ha of Forest Land Required for Laying… — lapsed
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted
- 3x15 (45) MTPA Low Grade Iron Ore /BHQ Beneficiation Plant at Villages Hedri,… — environmental approval granted
- Expansion of Iron Ore production capacity from 10 MTPA to 26 MTPA Hematite, 45… — environmental approval granted
29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.