Quick answers
What is this project?
18.30 m D.P. road (phase-I) from Malad hill reservoir to Appapada connecting Lokhandwala complex in P/N ward is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 12.6 acres.
Who is building it?
The applicant is Brihanmumbai Municipal Corporation.
Has it been approved?
No. The application was withdrawn on 22 Feb 2024, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹220 crore and a site of 12.6 acres.
When was it filed?
The application was filed on 22 Feb 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 18.30 m D.P. road (phase-I) from Malad hill reservoir to Appapada connecting Lokhandwala…
Project details
| Official title | Proposed Development of 18.30 m D.P. road (phase-I) from Malad hill reservoir to Appapada connecting Lokhandwala complex in P/N ward, at Village - Malad, Taluka – Borivali, District - Mumbai Suburban, in the state of Maharashtra, by Municipal Corporation of Greater Mumbai. (MCGM) |
|---|---|
| Status | Withdrawn |
| Status since | 22 Feb 2024 |
| Application filed | 22 Feb 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Brihanmumbai Municipal Corporation |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹220 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16621 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Jan 2025 | In-principle approval, conditions pending | 12.6 acres | ₹220 crore |
| New project filed 22 Feb 2024 (this page) | Withdrawn | 12.6 acres | ₹220 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.6 acres, this one is larger than 88% of them.
458 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (9.1 km away).
Other projects nearby
- 36.60 m D.P. road [(Phase-I) 18.30m] from Malad hill reservoir to Appapada… — under wildlife review, 0 m away
- 18.30 m D.P. road (phase-I) from Malad hill reservoir to Appapada connecting… — in-principle approval, conditions pending, 0 m away
- Proposed S. R. Scheme U/Reg. 33(10), 33(11), 30 & 32 On Land Bearing C.T.S… — environmental approval granted, 700 m away
- Proposed Residential cum Shopline with School & Dispensary Project is under… — under environmental review, 700 m away
- Project by Pandey Ghanwat Developers LLP — more information requested, 700 m away
- Slum Rehabilitation Scheme by M/s. Satellite Developers Private Limited — more information requested, 800 m away
- Slum Rehabilitation Scheme by M/s. Satellite Developers Private Limited — withdrawn, 800 m away
- Proposed underground parking below existing playground on plot bearing CTS No.… — more information requested, 800 m away
More from Brihanmumbai Municipal Corporation in Mumbai Suburban
- Flyover Arm-1 & Arm-2 at T-Junction on Sion Panvel Highway near Maharashtra… — under coastal review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — under wildlife review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — more information requested
- Diversion of forest land for construction of Twin Tunnel from Dharavi WwTF… — more information requested
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — under wildlife review
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — withdrawn
49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.