Quick answers
What is this project?
Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf to Bhandup Wwtf and Further Up to Bhandup Complex -Package 1 is a proposed project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 10.2 acres.
Who is building it?
The applicant is Brihanmumbai Municipal Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹3,216 crore and a site of 10.2 acres.
When was it filed?
The application was filed on 30 May 2026.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf…
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 30 May 2026 |
| Application filed | 30 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Brihanmumbai Municipal Corporation |
| Land area | 10.2 acres (4.1 ha) |
| Project cost | ₹3,216 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16801 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 May 2026 (this page) | Under wildlife review | 10.2 acres | ₹3,216 crore |
| New project filed 29 Apr 2026 | Withdrawn | ₹3,216 crore | |
| New project filed 9 Jul 2025 | Coastal clearance granted | ₹3,216 crore | |
| New project filed 4 May 2025 | More information requested | 10.2 acres | ₹3,216 crore |
| New project filed 25 Mar 2025 | Withdrawn | ₹3,216 crore |
In context
33 applications in Mumbai Suburban since January 2022 are in the same category (Other): 13 approved, 12 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.2 acres, this one is larger than 67% of them.
217 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (3.2 km away).
Other projects nearby
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — more information requested, 0 m away
- Proposed Redevelopment of Existing Transit Camp with LIG and MIG Type… — environmental approval granted, 150 m away
- Proposed Redevelopment project "SKYE-175" located at Building No. 175, Survey… — environmental approval granted, 200 m away
- Proposed Redevelopment of existing building no. 234 & 237, Kannamwar Nagar… — environmental approval granted, 300 m away
- Application for EC for proposed Redevelopment of Krantiveer Mahatma Jyotiba… — environmental approval granted, 300 m away
- Composite clearance for EC + CRZ for Proposed Redevelopment Of Building No.… — environmental approval granted, 350 m away
- Composite clearance for EC + CRZ for Proposed Redevelopment Of Building No.… — cleared for impact study, 350 m away
- Obtaining CRZ Clearance for the PROPOSED REDEVELOPMENT OF BUILDING NO. 157,… — recommended by coastal authority, 350 m away
More from Brihanmumbai Municipal Corporation in Mumbai Suburban
- Flyover Arm-1 & Arm-2 at T-Junction on Sion Panvel Highway near Maharashtra… — under coastal review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — under wildlife review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — more information requested
- Diversion of forest land for construction of Twin Tunnel from Dharavi WwTF… — more information requested
- Elevated Road from Bhakti Park Subway to Existing Bridge on Mahul Creek in M/W… — recommended by coastal authority
- Environmental Clearance for proposed expansion of residential buildings P1,… — environmental approval granted
49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.