Project details
| Official title | Proposal for Diversion of 0.0985 Ha. Reserved Forest Land for "laying the Proposed Railway Track for Connectivity of Gcto (Gati Shakti Multi-Modal Cargo Terminal Operator) Along the Existing Railway Line of Indian Railway at Village Shilottar and Sasunavghar, Taluka Vasai, District Palghar, Maharashtra State" Under Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980 in Favour of Arya Translogistics Private Limited. |
|---|---|
| Status | More information requested |
| Status since | 7 May 2026 |
| Application filed | 7 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Arya Translogistics Private Limited |
| Land area | 1,900 m² |
| Project cost | ₹4.5 crore |
| Village / locality | Shilottar |
| Taluk / tehsil | Vasai |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16787 |
In context
250 applications in Palghar since January 2022 are in the same category (Buildings & townships): 152 approved, 49 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.5 acres, this one is smaller than 94% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shilottar, Vasai, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Reserved Forest land for "Laying the proposed Railway Track for… — lapsed, 0 m away
- Proposed School Building of M/s Vidya Vikas education Trust's Universal… — environmental approval granted, 2.6 km away
- Proposed School Building of M/s Vidya Vikas education Trust's Universal… — environmental approval granted, 2.6 km away
- Proposed School Building of M/s Vidya Vikas education Trust's Universal… — environmental approval granted, 2.6 km away
- RE-DIVERSION OF 0.9988 HA. FOREST LAND FOR SHIFTING OF EXISTING 220kV BOISAR… — in-principle approval, conditions pending, 3.5 km away
- Shifting of Existing 220 Kv Boisar -Borivali & Boisar -Ghodbundar M/C Line,… — in-principle approval, conditions pending, 3.6 km away
- Proposed Warehouse (Non-polluting) outside CRZ area on land bearing S. No.… — recommended by coastal authority, 4.1 km away
- CRZ Clearance for Proposed Industrial Layout on plot bearing Survey Nos.… — recommended by coastal authority, 4.2 km away
More from Arya Translogistics Private Limited in Palghar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.