What is Developing? Open the mapMap

WithdrawnOther · Mumbai Suburban, Maharashtra

Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf to Bhandup Wwtf and Further Up to Bhandup Complex -Package 1

Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf to Bhandup Wwtf and Further Up to Bhandup Complex -Package 1 is a withdrawn project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. Its stated project cost is ₹3,216 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 25 Mar 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf to Bhandup Wwtf and Further Up to Bhandup Complex -Package 1 is a withdrawn project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

Who is building it?

The applicant is Brihanmumbai Municipal Corporation.

Has it been approved?

No. The application was withdrawn on 25 Mar 2025, so it is no longer under consideration.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹3,216 crore.

When was it filed?

The application was filed on 25 Mar 2025.

One of 5 filings for this project. The project's main page, with every filing and where each stands: Design and Construction of Tertiary Treated Water Conveyance Tunnel From Ghatkopar Wwtf…

Project details

StatusWithdrawn
Status since25 Mar 2025
Application filed25 Mar 2025
Approval soughtWildlife review
Application typeNew project
SectorOther
ApplicantBrihanmumbai Municipal Corporation
Project cost₹3,216 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16688

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 May 2026Under wildlife review10.2 acres₹3,216 crore
New project filed 29 Apr 2026Withdrawn₹3,216 crore
New project filed 9 Jul 2025Coastal clearance granted₹3,216 crore
New project filed 4 May 2025More information requested10.2 acres₹3,216 crore
New project filed 25 Mar 2025 (this page)Withdrawn₹3,216 crore

In context

33 applications in Mumbai Suburban since January 2022 are in the same category (Other): 13 approved, 12 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.

184 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (3.5 km away).

Other projects nearby

More from Brihanmumbai Municipal Corporation in Mumbai Suburban

49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.