Quick answers
What is this project?
Diversion of Forest Land in Phansad Wildlife Sanctuary for Construction of Elevated Eco-Friendly Ramp in Forest Gut No. 54 is a proposed building project in Kolmandale, Murud, Raigarh, Maharashtra. The site covers 36.5 acres.
Who is building it?
The applicant is Zehra Abbas Merchant.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kolmandale, Murud, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹4 lakh and a site of 36.5 acres.
When was it filed?
The application was filed on 23 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land in Phansad Wildlife Sanctuary for Construction of Elevated…
Project details
| Official title | Diversion of Forest Land in Phansad Wildlife Sanctuary for Construction of Elevated Eco-Friendly Ramp in Forest Gut No. 54 in Kolmandale Village, Taluka- Murud, Dist-Raigad in the state of Maharashtra |
|---|---|
| Status | More information requested |
| Status since | 16 Nov 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Zehra Abbas Merchant |
| Land area | 36.5 acres (14.8 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Kolmandale |
| Taluk / tehsil | Murud |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16861 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Jan 2026 (this page) | More information requested | 36.5 acres | ₹4 lakh |
| New project filed 23 Jan 2026 | Under forest review | 36.5 acres | ₹4 lakh |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 36.5 acres, this one is larger than 87% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kolmandale, Murud, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land in Phansad Wildlife Sanctuary for Construction of… — under forest review, 0 m away
- "Tourist Home Stay" located at Survey No. 64, Village-Kolmandla, Taluka-Murud,… — recommended by coastal authority, 800 m away
- CRZ Clearance For Proposed Tourist Home Project located at Gat no. 66 and 67,… — recommended by coastal authority, 1.9 km away
- Diversion of Reserved Forest Land Survey No. 44/0 of Village Korlai Tal.… — lapsed, 2.5 km away
- Diversion of Reserved Forest Land Survey No. 44/0 of Village Korlai Tal.… — more information requested, 3.2 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted, 4.7 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed, 4.7 km away
- Sponge Iron Manufacturing Plant JSW GREEN STEEL LIMITED -Transfer of EC — lapsed, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.