Quick answers
What is this project?
Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage System, Water Supply Distribution and Sewerage Network for Pmay Housing Scheme in Sector 39, at Kamothe, Navi Mumbai is a proposed building project in Kamothe, Panvel, Raigarh, Maharashtra. The site covers 1.3 acres.
Who is building it?
The applicant is City and Industrial Development Corporation of Maharashtra Limited.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 5 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kamothe, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 31 Dec 2025.
Project details
| Official title | Development of Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage System, Water Supply Distribution and Sewerage Network for Pmay Housing Scheme in Sector 39, at Kamothe, Navi Mumbai. |
|---|---|
| Status | Recommended by coastal authority |
| Status since | 5 Feb 2026 |
| Application filed | 31 Dec 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | City and Industrial Development Corporation of Maharashtra Limited |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Kamothe |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16923 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.3 acres, this one is smaller than 64% of them.
174 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamothe, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for proposed residential cum commercial building at Plot… — more information requested, 300 m away
- Environment Clearance for proposed residential cum commercial building at Plot… — withdrawn, 300 m away
- Environment Clearance for proposed residential cum commercial building at Plot… — withdrawn, 300 m away
- Environment Clearance for proposed residential cum commercial building at Plot… — lapsed, 300 m away
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant, 700 m away
- Residential Building on Plot 33, (12.5% scheme) Sector 36, Kamothe,… — returned to applicant, 1.4 km away
- Crz Clearance for School Building Project at Plot No. 15, Sector 36, Kamothe,… — recommended by coastal authority, 1.4 km away
- Proposed Residential cum Commercial project "One Millennium" located at Plot… — withdrawn, 1.5 km away
More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh
- Diversion of Forest land for proposed construction of Kondhane Dam in Karjat… — more information requested
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — lapsed
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant
- Roads and Channels on Forest land for Town Planning Scheme (TPS 2 to TPS 12)… — lapsed
- Development of land for International Education City — lapsed
- Providing, Laying & Commissioning of Water Supply Line and Raw Sewage Rising… — coastal clearance granted
27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.