Quick answers
What is Development of land for International Education City?
Development of land for International Education City is a lapsed public facility in Kundevahal, Panvel, Raigarh, Maharashtra. The site covers 247.1 acres.
Who is building it?
The applicant is City and Industrial Development Corporation of Maharashtra Limited.
Has it been approved?
No. The application was lapsed on 28 Nov 2025, so it is no longer under consideration.
Where is it?
In Kundevahal, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹102 crore; a site of 247.1 acres and 45.9 acres (18.6 ha) of forest land.
When was it filed?
The application was filed on 30 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Nov 2025 |
| Application filed | 30 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | City and Industrial Development Corporation of Maharashtra Limited |
| Land area | 247.1 acres (100 ha) |
| Forest land | 45.9 acres (18.6 ha) |
| Project cost | ₹102 crore |
| Village / locality | Kundevahal |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15155 |
In context
5 applications in Raigarh since January 2022 are in the same category (Public facilities): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
81 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundevahal, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New Construction for Logistics Park and Regularization of Existing… — under forest review, 1.1 km away
- Construction for New Logistics Park and Reguarization of Existing Construction… — lapsed, 1.1 km away
- Construction for New Logistics Park and Regularization of Existing… — more information requested, 1.1 km away
- Re-Diversion of Forest Area for Construction of New Service Roads With… — lapsed, 2 km away
- Proposed Residential & Commercial construction project at Plot No.03,… — environmental approval granted, 2.3 km away
- Environment Clearance for Proposed Residential Cum Commercial Development at… — environmental approval granted, 2.3 km away
- Environment Clearance for Proposed Residential Cum Commercial Development at… — withdrawn, 2.3 km away
- Proposed Commercial Building on Plot No. 14+15+25, Sector – 05, Pushpak Nagar,… — withdrawn, 2.6 km away
More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh
- Diversion of Forest land for proposed construction of Kondhane Dam in Karjat… — more information requested
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — lapsed
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant
- Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage… — recommended by coastal authority
- Roads and Channels on Forest land for Town Planning Scheme (TPS 2 to TPS 12)… — lapsed
- Providing, Laying & Commissioning of Water Supply Line and Raw Sewage Rising… — coastal clearance granted
27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.