Quick answers
What is this project?
Providing and laying 1200mm <1400mm<1800mm<2400mm Ø RC NP4 pipe sewer line by micro-tunneling method along Seth Govindram Jolly Marg to JVLR to E.E. Highway to Bhandup Pumping Station along E.E. Highway Service Road, Bhandup (E) in 'S' Ward is a lapsed road project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.3 acres.
Who is building it?
The applicant is Brihanmumbai Municipal Corporation.
Has it been approved?
No. The application was lapsed on 5 Dec 2024, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹159.8 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 25 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Providing and laying 1200mm <1400mm<1800mm<2400mm Ø RC NP4 pipe sewer line by…
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Dec 2024 |
| Application filed | 25 Jun 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Brihanmumbai Municipal Corporation |
| Land area | 1,300 m² |
| Project cost | ₹159.8 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17032 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Mar 2025 | Coastal clearance granted | 0.3 acres | ₹159.8 crore |
| New project filed 25 Jun 2024 (this page) | Lapsed | 0.3 acres | ₹159.8 crore |
In context
30 applications in Mumbai Suburban since January 2022 are in the same category (Roads & highways): 17 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.3 acres, this one is smaller than 79% of them.
293 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (1.2 km away).
Other projects nearby
- Providing and laying 1200mm <1400mm<1800mm<2400mm Ø RC NP4 pipe sewer line by… — coastal clearance granted, 250 m away
- Proposed Redevelopment of Dharavi Notified area under Scheme on Plot bearing… — lapsed, 550 m away
- Providing and Laying 800 Mm, 1200mm,1400mm &1800 Mm Dia Rc (Np4 Class) Pipe… — coastal clearance granted, 550 m away
- Proposed SRA Scheme on Plot Bearing CTS No- 797/A, S.No.248/1 of village –… — environmental approval granted, 650 m away
- Proposed SRA Scheme on Plot Bearing CTS No- 797/A, S.No.248/1 of village –… — cleared for impact study, 650 m away
- Application for EC for the redevelopment of existing slums by M/s. UVK DIVINE… — environmental approval granted, 650 m away
- Environmental Clearance for proposed Amendment & Expansion in EC for… — environmental approval granted, 850 m away
- Proposed Redevelopment of Dharavi Notified area under Scheme on Plot bearing… — lapsed, 950 m away
More from Brihanmumbai Municipal Corporation in Mumbai Suburban
- Flyover Arm-1 & Arm-2 at T-Junction on Sion Panvel Highway near Maharashtra… — under coastal review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — under wildlife review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — more information requested
- Diversion of forest land for construction of Twin Tunnel from Dharavi WwTF… — more information requested
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — under wildlife review
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — withdrawn
49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.