Quick answers
What is Proposed Slum Rehabilitation Scheme?
Proposed Slum Rehabilitation Scheme is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 2.6 acres.
Who is building it?
The applicant is N Khan Construction Works LLP.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 16 Sept 2024), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹246.9 crore and a site of 2.6 acres.
When was it filed?
The application was filed on 3 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Slum Rehabilitation Scheme
Project details
| Official title | Proposed Slum Rehabilitation Scheme at Village - Parighakhadi, Taluka Andheri and Village Kurla-IV, Taluka Kurla, Kurla (West), Mumbai, Maharashtra |
|---|---|
| Status | Recommended by coastal authority |
| Status since | 16 Sept 2024 |
| Application filed | 3 May 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | N Khan Construction Works LLP |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹246.9 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17145 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Jun 2024 | Environmental approval granted | 2.6 acres | ₹246.9 crore |
| New project filed 3 May 2024 (this page) | Recommended by coastal authority | 2.6 acres | ₹246.9 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.6 acres, this one is larger than 60% of them.
361 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.1 km away).
Other projects nearby
- Proposed Slum Rehabilitation Scheme — environmental approval granted, 0 m away
- Proposed Redevelopment of Existing School Building at Plot no. SF-5 in 'G'… — under environmental review, 550 m away
- Convention, Exhibition Centre and Commercial Complex at Plot No. C – 64, G… — environmental approval granted, 600 m away
- Convention, Exhibition Centre and Commercial Complex at Plot No. C – 64, G… — cleared for impact study, 600 m away
- Proposed Addition Alteration/ Vertical Extension in the Existing School… — environmental approval granted, 650 m away
- Environmental clearance of Proposed Commercial Building on Plot No. C-69(C) &… — environmental approval granted, 750 m away
- Amendment in environmental clearance of Proposed development of a Class -A… — environmental approval granted, 750 m away
- Proposed Expansion of Commercial office Building on plot Bearing no. C-59 'G'… — initial checks, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.