Project details
| Official title | Proposed Construction Of Water Pipeline From Uttan Naka To Pali Rama Hotel (Macchimaar Society) Petrol Pump In Uttan, Pali And Chowk Villages, Bhayandar (W), Thane District, Maharashtra By M/S. Mira Bhayandar Municipal Corporation (MBMC). |
|---|---|
| Status | Coastal clearance granted |
| Status since | 10 Sept 2025 |
| Application filed | 26 Jun 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mukane Nitin Raghunath |
| Use | Other |
| Project cost | ₹1.2 crore |
| Village / locality | Chowk |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17259 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chowk, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Strengthening of existing anti-sea erosion bund and proposed construction of… — recommended by coastal authority, 250 m away
- STRENGTHENING OF EXISTING ANTI-SEA EROSION BUND AND CONSTRUCTION OF NEWLY… — returned to applicant, 250 m away
- Proposed Reconstruction of Bridge at Uttan Velankani in Ward no.24, in the… — coastal clearance granted, 950 m away
- CRZ Clearance for Proposed residential Bungalow project in CRZ-II Landward… — recommended by coastal authority, 1.5 km away
- Proposed Construction of Olivium Resort by M/s. OLIVIUM RESORT LLP — recommended by coastal authority, 1.8 km away
- Proposed Construction of Olivium Resort by M/s. OLIVIUM RESORT LLP — lapsed, 1.8 km away
- Water Pipeline from Netaji Subhashchandra Bose Water Tank to Murdhe Khadi… — recommended by coastal authority, 2 km away
- Proposal under section 2 of Forest (Conservation) Act, 1980 FOR Diversion of… — lapsed, 2.3 km away
More from Mukane Nitin Raghunath in Thane
- Multispeciality Municipal Hospital at Reservation no. 302 at S.NO. /H.NO.… — environmental approval granted
- Water Pipeline from Radha Swami Satsang Metro Station to Nazreth Aagar — coastal clearance granted
- Water Pipeline from Dongri Kumbharda Datta Mandir Bus Stop to Dongri Pumping… — recommended by coastal authority
- Water Pipeline from Netaji Subhashchandra Bose Water Tank to Murdhe Khadi… — recommended by coastal authority
- Proposed High Rise Water Tank at Reservation No. 201 & Survey No.206, in the… — coastal clearance granted
- Proposed Solarized Mechanical Composting Plant of 20 TPD Capacity near Sachin… — recommended by coastal authority
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.