One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Construction of Olivium Resort by M/s. OLIVIUM RESORT LLP
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 11 Jul 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Olivium Resorts LLP |
| Land area | 5 acres (2 ha) |
| Project cost | ₹151.2 crore |
| Village / locality | Uthan |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-17877 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Jul 2024 (this page) | Lapsed | 5 acres | ₹151.2 crore |
| New project filed 11 Jul 2024 | Recommended by coastal authority | 5 acres | ₹7.9 crore |
In context
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Uthan, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Construction of Olivium Resort by M/s. OLIVIUM RESORT LLP — recommended by coastal authority, 0 m away
- Proposed Reconstruction of Bridge at Uttan Velankani in Ward no.24, in the… — coastal clearance granted, 1.2 km away
- Water Pipeline From Uttan Naka To Pali Rama Hotel (Macchimaar Society) Petrol… — coastal clearance granted, 1.8 km away
- Strengthening of existing anti-sea erosion bund and proposed construction of… — recommended by coastal authority, 1.9 km away
- STRENGTHENING OF EXISTING ANTI-SEA EROSION BUND AND CONSTRUCTION OF NEWLY… — returned to applicant, 1.9 km away
- Proposal under section 2 of Forest (Conservation) Act, 1980 FOR Diversion of… — lapsed, 2.6 km away
- Metro Line -9 Alignment From Dahisar (East) Station to Entry Point of Proposed… — coastal clearance granted, 2.8 km away
- Water Pipeline from Netaji Subhashchandra Bose Water Tank to Murdhe Khadi… — recommended by coastal authority, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.